eprbulletsafsc.com

3D1X2 Cyber Transport EPR Bullets

PERFORMANCE ASSESSMENT

- Paved way for satellite upgrade; doubled bandwidth--connected Theater leadership to JCS for expedited C2

- Revitalized duty position; authored six continuity books from scratch--vital continuity for one-deep position

- Selected as shift leader during PenORE--supervised 11 team members--sustained 100% mission completion

- Spearheaded efforts to repair Air Mobility Division's network printer--enabled 50 users to print critical ITOs

- Aided server backup deployment--slashed task from 8 hrs to 1, established data redundancy for 27 remote units

- Discovered unapproved chat software on network--quickly eradicated program--secured coalition sys integrity

- Repaired ROKAF/CC COIN computer--rapidly responded & fixed outage--ensured coalition aircraft control

- Project leader--configured & installed 26 Korea AOC C2 systems--critical wartime intel assets now available

- Chosen for Gunsan AB TDY--set up 11 C2 systems for 8 FW Command Post--fully restored network access

- Managed shop physical security program--enhanced safeguard of classified info during daily ops--no errors

- Installed 2 UNIX workstations for Combat Plans--supported continuous ITO production and sortie execution

- Successfully performed weekly Air Battle Plan purge on 24 completed msns--improved server efficiency 10x

- Hard-charging Airman; orchestrated turn in of 38 cryptographic equipment valued at $143K--AF reutilization

- Rock-solid evaluator; performed 10 post deployment inspections on tac comm wireless sys--zero msn fail rate

- Coordinated w/PACAF NCC--rectified SATCOM connectivity during PENORE; secured comm for six COBs

- Excelled as unit TMDE coordinator; delivered 60 equip items valued at $50K--ensured proper mx calibrations

- Revitalized T.O. library; single-handedly managed 74 tech orders/commercial manuals--sq now in compliance

- Go-getter! Reconstituted HAZCOM program/developed w/c master listing--improved overall safety standards

- Revamped Unit Physical Training testing prgm; 46 Airmen tested on time/database accurate--no overdues

- Authored/incorporated w/c tool pgm; identified/recorded master tool list--100% accountability of $4k assets

- Orchestrated OSI classified data transfer fix; SIPRNet access restored--vital to 11K intell report deliveries

- Supervised VPN router installation; quadrupled remote access account pool--enabled 900% faster connections

- Attacked base-wide network outage; first to find/correct bad router setup--restored access for 6K customers

- Voluntarily changed shifts to deal with manning issues; worked three extra days--ensured 24/7 NCO presence

- Deployed new network management maps; enhanced problem isolation/trend analysis--ensured 99% uptime

- Oversaw 15 techs actions during major power failure; only 3 hours downtime--restored 6K users' connectivity

- Led network management database cleanup; updated 68 configs--switching errors down 11% ... promote now!

- Stepped up during NCOIC absence; supervised 29 troops on 3 shifts--directed completion of 59 work orders

- Solved weather circuit issue stumping top techs; rerouted link to bypass bad hub--averted canceling 22 sorties

- Directed software corruption response; 24 disabled switches made operational--restored access for 3K users

- Resolved 325 FW/CP comm outage; contact with base leaders re-established--full C2 restored in minimal time

- Consistent outstanding duty performance resulted in July 2004 325 CS Top 4 Performer of the Month award

- Shop POC for CSAF visit; set up billeting and office connections flawless service--promote immediately!

- Fixed faulty dining hall link; restored key station for supply ordering--vital to support of 900 daily customers

- Repaired Enlisted Club connection; restored link in 25 minutes--ensured flawless MSG commander s call

- Resolved Southeast Air Defense Sector (SEADS) classified link failure; isolated/rerouted problem circuit in 40 minutes to avert critical security degradation--unhindered NORAD air defense ops over Southeastern U.S.

- Dispatched workers to SIPRNet link outage; restored 1 AF/CC's main circuit--key Homeland Defense C2 link

- Troubleshot/repaired ATC tower switch; reenabled critical safety reporting--local/base airspace incident-free

- Located deployment facility switch problem; ended data transfer errors--optimized processing for 345 TDYs

- Reacted to MXS network failure; found/fixed defective link--uninterrupted security of 956 items/39M in assets

- Troubleshot base-wide network outage; reconfigured router--restored access for 6K customers ... promote!

- Orchestrated AFSOC/CC visit support; put in 20-hour day to direct actions--ensured flawless connectivity

- Rerouted CONS printer access; expedited $35.4M in contracts--helped meet monthly zero-error contract goal

- Voluntarily changed shifts/worked 3 extra days; overcame shop manpower issues--ensured 24/7 NCO presence

- Resolved 43 FS connectivity issue; users back online just in time--averted nine F/A-22 sortie cancellations

- Detected 1 AF network fault; reconfigured crypto devices--ensured fluid C2 over 590 ONE flights ... promote!

- Oversaw $18M of communications gear supporting 2.8K people in 13th AF, 36 AEW, and 14 Associate Units

- Expertly directed installation and troubleshooting of 35 circuits; managed all wired USAF voice and data links

- Performed network trend analysis; compiled and analyzed daily stats--key to 99.9% connection availability

- Led facility restoration; removed old furniture--eliminated safety hazard, provided new storage location

- Redesigned critical FAA circuit path; completely eliminated comm faults--delivered most reliable radar image

- Created shop tool accountability system; daily inventories prevented loss of $2K of test equipment and tools

- Corrected discrepancies in 34 circuit layout diagrams--slashed circuit fault isolation workload by over 27%

- Recreated 16 outdated operating instructions--ensured strict compliance with DISA directives and publications

- Single-handedly installed 15 Asynchronous Digital Subscriber Line circuits--assured connectivity for 60 users

- Led tactical encryptor upgrade; eliminated obsolete gear, upped classified bandwidth 700%--first in PACAF!

- Enhanced personal technical skills; completed 96 hours of advanced commercial network technologies training

- Installed red switch phone at 13 AF/CC's home--guaranteed 24-hour secure C2 for tsunami relief efforts

- Talented technician--recognized by 36 CS/CC as the unit Team Outstanding Performer March and April 2004

- Spearheaded rewiring project; labeled and relocated 60 cables--created optimally efficient work environment

- Lead tech on $100K hardware upgrade; done 2 weeks early--modernized equipment tripled data throughput

- Entrusted with ADPE custodian duties; flawlessly managed $61K account--100% accountability of AF assets

- Re-engineered central data relay; reduced wiring connections by 25%--facilitated troubleshooting FAA link

- Revamped shop computer connections; moved seven PCs/on printer--key to management of 68 trouble calls

- Rewired Command Post connection; ended routing errors--ensured uninterrupted reporting to MAJCOM

- Troubleshot 13AF/CC remote access problem; corrected faulty configuration--restored tsunami relief C2

- Troubleshot Wing Command Post Red Phone outage; reseated modem card--restored C2 notification ability

- Identified electrical wiring problem; oversaw electrical upgrade; stable power supply reduced outages 10%

- Implemented comprehensive trouble log review; analysis of 12 months of data identified problem trends/fixes

- Updated 34 Service Agreements; provided up-to-date POC info--optimized troubleshooting coordination




We need more examples. Bullet statements may be contributed using this form. Thanks!