- Executed 14 mx tasks; renewed $3M sys w/558 gals coolant/oil--tripled kW output & svd 12K gals fuel w/in 10 days
- Led emer pwr recovery; responded to gen failure, 145 fac's restored w/in 5 min--sustained $5M pwr plant/CSAR msn
- Headed refuel ops; coord'd pln w/TURAF/trn'd 2 AFSC's/9 Amn--dlvr'd 18k gals diesel, upheld 24/7 ops spt'g 2 Sq's
- Aided $1.4K WFMS reno; pwr'd 4 sewage pumps, rpr'd 6 circuits--elim'd 50K gal/water impasse, 9 latrines energized
- Enabled 1.5MW pwr upgrade; installed 52K lbs WRM assets, reset 2.4K ft HV cable--restored capes to 100% <6 hrs
- Directed 750kW sys rpr; guided 3/ID'd fuses, synch'd unit pwr grid <2-hrs--averted $300K rplcmnt, lauded by Sq CC

- Participated in Jt Ex Max Thunder; responded to 3 F-18 barrier engagements--recovered 3 pilots/aircaft worth $120M
- Rebuilt approx 14 BAK-14 arms; replaced degraded block arms on south BAK-14--saved $17k on replacement costs
- Thwarted RAPCON generator failure; replaced crucial o-ring resolving coolant leak--saved $30k asset from total loss
- Reacted to in-flight emer; ensured successful engagement of the acft arresting sys--saved 1 pilot/aircraft worth $18M
- Repaired airfield lighting generator; replaced coolant sys block heater--prolonged life of unit/restored emer afld ops
- Responded to 2 base outages; provided 10.3 MWh/21 hrs emer pwr--protected base critical security/network systems

- Led shop safety program; corrected 13 discrepancies/updated safety program--annual inspection passed/0 write-ups
- Performed Mx on 25 generators; 6 sets of aircraft barrier assets valued at $1.2M--ensured 100% equipment reliability

- Executed 200 rnwy configs; ensured 24/7 capability/zero deficiencies--Afghan's #1 divert base prep'd for IFE

- Led 4 Amn/maintain'd MAAS/MRES worth $716K; perform'd 80+ rnwy configs--negated $7.2M civ contract

- ID'd/rpr'd faulty actuator pumps; prevented a/c damage/avoided rnwy closure--ensured pilot sfty/0 sorties lost
- Spearheaded $9.6K rewind clutch repair; eliminated 1.5 yr old issue--provid'd spt to 18 aircraft worth $324M


-Built durable grnd'ing grid; reduced ohmage 99%; spt'd $5M assets/enduring ex site--saved Gp 160 man-hrs/yr
-Superior ldrship; central to standing up CE flt/key to unit's 36 CRG Sq of the Year '10 award--promote soonest


- Supv'd 5 mbrs w/ AAS mx; ID'd/replaced damaged 150ft arresting cable--73 pilots successfully train'd this qtr
- Diagnosed BAK-12 start sys; repaired/ replaced inop charging alternator--safeguarded 138 acft valued $3.5B
- Maintained 49 generators; conducted 74 hrs mx/repaired 23 deficiencies--ensured 100% emergency reliability
- Aided w/ 3 BAK-12 absorber syncs; linked both sys together for braking run out--rescued a F-16 worth $25M
- Managed section's safety pgm; authored JSTO/ completed spot inspections--zero Wg safety inspection right up
- Spearheaded generator trng; taught/applied 3 facilities/9 personal ops--force multiplier reduced response 80%
- Trained radar facility loadbank ops; taught proper load function--reliable power ensured 60 mile flt safe zone
- Repaired receptacle on MEP 805B gen; replaced frayed cable--ensured dispatch of 424 vehicles worth $25M!

- Studied commercial/T.O. manuals; enhanced ATS/generator knowledge--reduced maintenance repairs by 15%


- Field Boss for basewide pwr outage; led/ensured efficient op of 24 gens--upgraded elec grid for F-35 platform
- Expedited 4 F-16 barrier engagements; insp d/cert'd sys function--protected $100M /restored afld ops < 15min
- Showcased multi-AFS talent; executed emer troubleshot/repair of BX chiller--restored A/C for 1K daily users
- Composed contingency gen fuel plan; prioritized critical sites/sized fuel tanks--met ETL; wg rdy for emerg ops
- Managed quality assurance prgm; id'd/corrected 25 discrepancies--provided oversight for over $670K assets
- Oversaw AAS trng; trn'd 12 1st responders on BAK ops/recovery--ensured 72 plts safe for 6K sorties/8K hrs
- Vital during command post pwr outage; changed faulty control card--reinstated emerg pwr for control facility
- Polished communicator! Gathered info, penned/emceed retirement script--dignified 37 faithful yrs of fed svc
- Managed daily RWP/projects; executed 330+ hrs of AAS/gen mx--enabled uninterrupted plt trng/medical ops
- Led emerg pwr recovery; id'd/replaced defective 125 amp fuses--trn'd 2 on vital skill; restored C2 comm feed


- Attended 11 work grps, performed Tech Review of Muthanna Province $900,000 auditorium--ensured reliability

- Synchronized 35 power outages; min impact to customers, kept schedule, reduced wing energy consumption 25%

- Identified defective 250KW gen, replaced faulty elec alternator--saved AF $300K in repair/replacement costs

- Oversaw TF Safe program, inspect'd 15 facilities, mitigated 14 findings, repaired 3, drafted $5K SOW for rest

- Maintained pos control of equip, prioritized assets against Base X facility priorities--excellent on Wg inspection

- Led inspect of 4 deteriorating power gen sys suppting 400 Iraqi AF personnel--patched on Drawdown timeline

- Devel'd detailed cantonment area electrical plan & reconfiguration/elec layout diagrams--poised for emergency

- Conducted 120+ acft Arresting System inspections, 5 barrier certifications at Joint Base Balad--key to safety

- Authored comprehenisve refueling plan to meet gen fuel burn rates/routes--decreased workload, increased effcy

- Installed dedicated power for a National Distress System unit--boosted surveillance range by over 25%

- Responded 2 island-wide pwr outage--restored pwr to 61 critical facilities to include a 3.5 megawatt power plant