AFSC 3E1X1/HVAC EPR Bullets

- Directed freezer upgrade; led 3 prnl/installed 4 freezer doors--averted $10K food loss, maintained svc f/1.2K patrons
- Vital to heat plant upgrade; trenched 12 meters, replaced 3-ft of damaged pipe--prevented 3K gals of water loss daily
- Oversaw MXS fuel syst rpr; secured 60-ft purge duct--zero msn loss & guaranteed mnx of 29 F-16s valued at $765M
- Led 3-mbr emergency tm; calibrated ventilation syst/chiller ctrls--spt'd 2 wg events & sustained $4M in HVAC assets
- Overhauled Warfare Center humidity syst; replaced 30 UV lamps--protected $30M in assets, saved $15K in ktr costs
- Restored Alt CP A/C; led 3 prsnl/installed 2-ton unit--saved $10K in comm servers & equip/sustained wg's 24/7 msn


- Mng'd R&O Mech AMP; drove mx 1.1K HVAC sys's/preserved $1B eqpmt/reduced failure 65%--$10.2B fac's intact
- Created CE multi-craft PM validation database; found >330 assets for 67 critical fac's--increased eqpmt lifespan 80%
- Stood up AF level asset condition prgm; evaluated >$20M in proj's--bolstered crit data support for FY16 IPL defense
- Steered KMC eqpmt inventory capture; led 52 techs/4 AFSCs/1.3K fac's--completed 3 yrs ahead of AFCEC deadline
- Reviewed 32 construct designs/11 SOWs; provided 27 HVAC inputs--ensured proj's met stringent Fed/German reg's
- ID'd RAB's oldest a/c sys's for replacement; processed 16 WOs--reduced ops costs by $250K/steer'd CE's #1 priority
- Liaison for UAV build-up study; analyzed >100 ft piping/30 units--strength'd USAFE/AFRICOM/CENTCOM msn's
- Engineered 86 CS cooling tower proj; sourc'd rpr contract--solution svd $200K vs replacement/zero comm downtime
- Fill'd Mech Eng pos 8 mos; direct'd review of >40 fac's/elim'd 1K contract defects--on-target to garner AF lvl funding
- Directed HVAC WO requests; drove 24 in-house proj's--saved $400K vs contract costs/fortified mililtary OJT
- Managed 10 yr infra prgm FY16/17 IPlan; validated 22 projs/125 wk rqmt's--postured >$20M future execution
- Led USAFE's lrgst R&M IPL prgm; RAB prim'd for success in FY16 w/$18.1M/45 sustainment proj's

- Supervised 7 troops; executed 1.5K jobs/achieved 98% same day svc rate--maintain'd 3.5K HVAC sys/$4.5M
- Guided 3 Amn; restor'd five problem units at wg auditorium--achiev'd optimum climate for CC/wing functions
- Direct'd recurring work prgm/400hrs; increased equipment performance reliability--reduc'd service calls 65%
- Trained 4 Amn; managed A/C upgrade, restored climate control--safeguard'd network control ctr's $9M server
- Install'd 12 A/C units for F-15 hangars; ensur'd timely mx of $358M assets--key to success/1.4K theater sorties
- Repair'd A/C unit for internet transfer node; restor'd equip cooling--saved $1M network/enabl'd real-time ISR
- Spt'd Army Patriot site/maint'd 25 units; protected $35M SAM asset/150 psnl--promoted base defense function
- Earned 6 cr hrs towards BA; host nation beautification proj leader; AF10K/Race for Cure 5K; s-ball team mbr


- Led install of 1.5 ton cooling unit; prevented AFN eqpmt over heating--ensured radio & tv forecast f/10K mbrs


7-level

- Excelled as Mechanical Foreman, post held by seasoned SNCO--took on new duties with uncommon zeal

- Led section in 100% air conditioning upgrades/installation; reviewed $3.5M in contract projects for Misawa

- Supervised repair of air conditioning at Air Force Network facility; protected $2.5M in critical equipment

- Exercise Evaluation Team (EET) volunteer; evalutates Civil Engineer UCC/DCC major accident response

- Expertly evaluated over 120 job orders; developed short/long range goals, an astounding 80% completion rate

- Exercised judgement and initiatieve; made sound recommendation on $1.7M air conditioning upgrades

- Superb manager; programmed/executed recurring work program with impressive 100% completion rate

- Standards and professional competence generated immediate confidence/improved subordinate morale

- Assisted Base Infrastructure Program Review and assessment on central heat plant and steam distribution

- Liased with Japanese Air Force/civilian authorities bus accident response; fostered strong partnership

- Established contingency plan and trained facility managers for biological/chemical threat to military assets

- Created database/tracked ventilation equipment in two hundered facilities--improved air quality/production

- Active in community--Prepared family style barbeque for 35th FW at Hirosaki's Cherry Blossom festival

- Took command with ease; completed over 450 scheduled work requests; supervised 11 military/12 local national employees

- Maintained 99% completion rate on Heating Ventilation Air Conditioning Recurring Work Program

- Led aggressive electrical evaluation of base-wide HVAC systems; programmed conversion to local 200 VAC/50 HERTZ

- Identified over 300 sensitive pieces of equipment valued at $1.2M ensuring frequency compatability

- Flexible and versatile leader with unbounded potential, ready to assume SNCO responsibilities!



9-level

- Excelled as Facilities Superintendent for over 60 days during incumbents absence

- Managed 133 personnel in 4 demanding shops: Housing Maintenance, Vertical, HVAC & Horizontal

- Coordinated Wing Commander's change of occupancy; zero discrepancies noted during move-in

- Recommended use of user-friendly thermostats and filter replacement media--modernized without expense

- Re-engineered inadequate 2.5-ton air conditioning system at busy 22nd Comm Squadron snack bar

- Calculated heat load; orchestrated electrical upgrade, duct modification and installation of 15-ton system--praised by Wing Commander

- Emceed at Chief Enlisted Manager's farewell as acting First Sergeant; ensured proper send-off

- Organized base-wide golf tourney benefiting Armed Forces Retirement Home; fundraiser netted over $1500

- Co-organized base Top-3 weekend golf tournament; great morale booster for base

- Led heavily-tasked CE section in support of Force Protection--supervised erection of 45 bitburg barriers at key points base-wide; enhanced Force Protection

- Replaced or re-pinned over 40 entry gates--eliminated base perimeter breaches, enhanced force protection

- Managed flightline Snow and Ice Removal program--kept airfield operational despite 50% reduction in snow removal assets-- zero delays to airfield operations

- Planned restroom construction at Readiness Flight facility--Conducted cost analysis, recommended in-house project; saved $70K