eprbulletsafsc.com

3E2X1 Pavements & Construction Equipment

- Led 4 prsnl/$7K proj; routed/sealed 574 ft/joints/painted 3K sf concrete--safed $1.3M tools/eqpm iso $2.3M proj yrly


Construction Support (Project Planning bullets)
- Composed YPG rqmt; sourced/procured $400K in matl's/equip incrs d HALO jump caps 150%/36K students ann
- Tackled AU/CC s #1 pri; enabled 3 projs/18 facs/$4M trng site expans n--surg d cadet capacity 83%/sav'd $1.3M/yr
- Led Columbus AFB TTP Airfield planning; developed expert design anlaysis for $1.85M projs--zero down time UPT
- Benchmarked GSA STR account; dev vehicle shortfall solution/coord'd $400K ctr--100% veh req met/FY '17 projs
- ID'd 5 proj planning developmental areas; inspected existing processes--improved matl's procurement/delivery 30%
- Provided crit data f/FY '17 $4.2M/8 proj TTPs; integrated trng rqmts f/350 psnl--expanded planning/trng capability
- Pilot'd AF's largest troop labor proj ever; planned/sourced BOM f/$101M base in Africa--enabled CCDR's #1 priority
- Managed proj planning cell f/5 AFSCs/13 projs; compl'd/procur'd $2.72M const mat'l--enabled FY'16 TTP execution


- Worked outside AFSC; demolished 10K ft conduit/26 light canisters--ensured txwy rdy for $50K afld lighting circuit

- Critical influence to airfield maintenance; assist'd in econstruction of 26 spalls-- safeguard $8.8 mill in aircraft

- Led erosion control tm; installed 7K lf silt fence/4.3K t-posts--strict SWPPP followed/averted $4.5K in fines

- Led 18 Amn; upgraded DFAC/installed 24 CM concrete pad/cart path--expanded perishable food storage 50%
- Built Entry Control Point; laid 12 CM concrete, relocated guard shack--elim'd ESFS write-up, safed 3K prsnl
- Cultivated joint service relations; support'd Seal Team One bed down, employ'd eight Seabees--improv'd QoL
- Drove the completion of 214 WOs/126 spall repairs--protected $5.3B acft/garnered EMSG Team of Bi-Month
- Fortified Army Patriot sites; poured 144 sf base, erect'd armored tower--safed artillery worth $400M/150 pers
- Guid'd KIA Memorial proj, instruct'd 23 multi-craft Amn on paving techniques--ensur'd enduring remembrance
- Spt'd 2 emer incidents; rigg'd reefer unit/2-500Kw generators--permitted continued service to 3K ADAB prsnl
- Comp'd Army 10 Miler, AF Half Marathon, 5/6 Assoc. mbr, SEJPME, 1 PDS, EMSG Team of the Bi-Month


- Formed/finished 100 yds of concrete curb/gutter for $654K SF pking lot at Seymour Johnson--kept proj on trk
- Prep d/shipped milling machine for Seymour Johnson FY13 TTP; critical to $654K SF pking lot mill/overlay!
- Graded $654K parking lot for 4th SFS at Seymour Johnson; essential for drainage--created 36K sft pking area
- Hauled 1K tons deteriorated concrete/1.1K tons sub-base to local concrete crushing plant--recycled materials
- Outstanding Operator! Milled/paved 758 tons of hot asphalt mix--created 36K sft pking area for 4th SFS group!
- Manag'd $654K 4th SFS pking area; increas'd 75 add'd parking spots--supports 200+ security forces personnel
- Hand-selected as horizontal craft lead; milled/paved 758 tons of hot mix--Airman trained for war time mission
- Project Mgr/mat supt for $654K pking lot upgrade at Seymour Johnson; built new pking area for 4th SFS group
- Mgd $654K paving proj at SJ; paved 758 tns asphalt for SF pking lot--multi-million dollar savings vs contract
- Key project manager/support for $486K wash rack facility upgrade at SJ; upgraded to accommodate F-15 ops
- TDY for 60 + days to SJ; 823 RHS Site Superintendent; spt'd 2 projs valued at $1.1M--projs on target/budget!
- Supervised 25 Combat engineers for FY13 TTP at SJ--facilitated wartime skills/trng for 25 + Amn/4 AFSC


- NCOIC Afld trng element; managed prgms/supervised 6 NCOs--ensured section/170 psnl trng rqmts compl'd
- Records Custodian; selected flt prgm mgr; reviewed/edited 37 records/policy/appt letters--prgm IAW ACC std
- Key w/Camp Rudder TTP; led 10 psnl/removed 120 tns asphalt--proj finished on sched/37 core tasks compl'd
- Aflds primary UTC monitor; tracked/logged 1247 SORTS items--122 RH mbr's/16 increments compliant/FMC


- 1st choice! Test'd new ADR eqpt/matl's; rpr'd 8 craters--pioneer'd future jt techniques for 4K 3E2/3 engineers
- Self id'd 4 mi strike hazards; worked 435 hrs w/ BASH director--enabled 22K training sorties/Luke afld FMC
- Safety advocate! Provided wkly briefings for 21 prsnl; ensured ORM applied within shop--0 mishap/incidents
- Showcas'd skill-set; precisely set 2-20 ft FC simulators--creat'd jt partnership trng for 900 mil/local FES prsnl
- Surveyed/prepped 4K sq ft site; poured/constructed 108 cy concrete foundation--secured $130K+ FMO assets
- Efforts unmatched; paved 530 tns of asphalt at south AGE yard--mitigate safety write-up/$2.5M equip protect'd
- Directly supervis'd 2 Amn during wg barrier plan execution; plac'd 76 barriers--protected 10 critical facilities
- Expert equip operator! Remove'd 2.5K tons vegetation/debris--$9M ILS radar signal restor'd/saved AF $35K
- Cleared 5K acres at BMGR; hauled 420 tns of munitions/219 UXOs--15K GB sorties flown/critical to GWOT


- Team Player! Comp'd 350 DSWs/3 projs/95 RWP/$400K value--mx'd 1K+ bldgs/supt'd $5B in assets/6K psnl
- Improved AGE supply yard; paved 530 tons asphalt/poured 36 yds concrete--saved $47K/lauded by OSS/CC
- BMT ldr; directed 42 trainee's/ensured mbrs complied with orders/instructions--earned Warrior Flight honors
- Created EOD storage magazine site; graded/rolled 40 ton safe route--increased ADAT response time by 75%
- Restored 22K ft drainage ditch; removed/hauled 2K ton of vegetation--mitigated local flood risk/saved $275K
- Expertly led 2 man tm; quickly rpr'd 100 ft breached perimeter fence--swift actions ensured FP/7K+ base prsnl
- Constructed 50 x 80 ft FMO bldg; poured 108 yds concrete--saved $130K contract cost/coined by MSG/CCC
- SME; built 2K sq ft vehicle awning--set 12 beams/50 panels--protected $2M equip fleet/ext'd srv life >15 yrs
- Deployed down range! Work'd C2 upgrad'd/install'd 120 ft security fence--vital to 590K mi Arabian air space
- Led backhoe trng crs; guid'd 6 comm NCOs w/ install of 500 ft alarm sys--safe'd $29M assets/10K+ personnel
- Coordinat'd P&E/CES Spouse Immersion; instructed 27 prsnl/provid'd job specific knowledge--lauded by CC


- Superior leadership for operations flight; 204 people 113 military/91civilians; oversaw $12M O&M budget
- Directed infrastructure program for 187 F-16s flying 37K annual sorties; supported 1K pilots/1K crew chiefs
- Maintained FW's biggest vehicle fleet; 110 general-purpose vehicles/specialized equipment valued over $3M


- Flight MCD instructor; batched/placed/finished 80-cy concrete--sustained contingency concrete operations msn

- Dedicated 80 hrs/assisted Airfields VCNCO; inspected 150 pieces of equipment--ensured RHS 72 hr response
- Loaded 13 trucks for Ft Bliss proj; secured 40 pieces equip--ensured completion of $1.8M SOG trng complex

- Lead 8-man tm; rebuilt 18 UTC kits worth $9.6M--ensured 100% accountability/prep'd future contingency msn

- Supervised 30-hr loader/backhoe/trencher operator course--garnered 5-level core task certification for 5 Amn
- Managed bldg 1460 tree removal; no power outages/damage--averted safety issues/saved $2K vs contract cost
- Spt'd 341 MW; leveled 30 tons of earth/removed sniper havens--safed $2.7B Protection Level 1 (PL1) assets
- RHS Booster Club president; orchestrated 10 unit morale/fund raiser events--raised $2K for kids holiday party
- Provided setup/tear down for annual Pedal for the Medal race--earned $10K to support local Special Olympics
- Crew lead during $714K Ellsworth project; milled/paved 4.3K tons asphalt--resurfaced 1.4 miles of roadways
- Coordinated/prepared Ft. Lewis line-haul; inspected/loaded/secured 30 tons msn critical tools/equip—promote
- Led DRMO drainage reconstruction; leveled 1.2K tns of fill--reduced environmental issues at critical outflow
- Active w/Big Sky Top 3; mbr of 35-man Adopt-A-Highway tm--beautified 2 miles of Montana State Highway



- Project lead for $520K CC/BPC running trail; crafted 3 mi course--elevated wing safety /QoL for >11K prsnl
- Key lead for $138K VBIED denial sys install; installed 13K-sq-ft cordon--secur'd 6K prsnl/$1B in PL 2 acft
- Prep'd 475K sq-ft eqpt storage yard; cut msn lag time by 10%--provided controlled access for $2.4M in assets
- Erected 3K sq-ft storage fac; indexed 1.2K items/$368K in resources--availability slashed response time 33%
- Drove $150K radar install for JPRSS; enabled 55% increase in global CSAR gnd com--spt'd 70K cmbt forces
- Vol'd 21 hrs/4 SQ/2 WG lvl events; set-up 1st ann WG triathlon/ECES cmbt dining out--sustained >600 mbrs
- Enginr'd eqpt access to water purification fac; elim'd disruption for 47 msn critical facs--spt'd 8K cmbt sorties
- SNCO lvl ldr; reallocated $210K in assets/oversaw 154K ton mat reassignment--negated $750K expenditure!
- Stellar operator; maintained 7M sq ft infrastructure/2 runways/430 fac's/closed 3K DSWs--spt'd 6K Jt Forces!
- Sustained airfield movement area/AMC ramp; repaired 150 spalls/craters--enabled 27K joint flt ops missions
- Performed 200 sweeper runs; labored 300 hrs/eliminated FOD threats--provided IqAF flt tng/USF-I msn safety
- Eradicated 190 afld obstructions; recycled 1K tons material & cleared 4 ramps--reduced aircraft hazards 65%
- Implemented trng plan; instructed 192 hrs/taught spall & crater repair--2 trainers/15 IqAF specialists qualified
- Overhauled main base road; poured 36 cu ft concrete/created ILS electric tie-in--curtailed USF-I costs $100K
- Volunteered as vehicle NCO; conducted training/tracked usage/scheduled maintenance--managed $952K assets
- Exceptional NCO; flt mail clerk/distro'd 2.7K parcels/performed 10 flag ceremonies--boosted morale/70 mbrs
- Key mbmr airfield pavement repair team; fixed 150 pavement spalls/craters--enabled 8K safe aircraft sorties
- Eliminated 170 airfield obstructions; graded 1K sq ft/removed 5K tons debris--ensured safe joint use airport
- Responded to 36 Emergency sweeper calls; eliminated FOD threats to US & Coalition aircraft--zero mishaps
- Performed 200 sweeper runs; >300 manhours--elimanated FOD threats to coalition aircraft, zero misshaps
- Preserved airfield concrete/asphalt; repaired 150 spalls & craters--27K USAF/IqAF acft ops safely executed
- Graded 2K sq ft rd; reclaimed material/filled pot hole/built drainage ditch--allowed safe travel 75 personnel
- Enhanced safety; unloaded/placed 228 security barriers--heightened security to10K Army/Air Force personnel
- Maintained pavement/eqpmt; sustained nine sq km/two runways/completed 200 work orders--supported OND
- Assist HVAC in 25 mini split unit refurbish; replaced capacitors/fan motors--salvaged $170K reusable assets
- Led construction debris removal; eliminated 1K tons airfield hazards/cleared AMC ramp--AFCENT compliant
- Located/identified hazard on airfeld; reported immediatly--decisive acts prevented harm to personel/aircraft
- ID'd hazardous material; disposed 300 gallons waste/averted potential disaster--ensured 6K joint forces safety
- Constructed ILS road; hauled/graded 400 tons material/enabled safe access--safed critical Iraqi/USAF eqpmnt
- Enhanced ECP; trenched high-voltage cable/placed 25 tons gravel/protected jamming radar--enhanced security
- Eliminated 5 force protection perimeter fence discrepencies--heightened physical security--secured $ base ast
- Assisted Utilities on water main break; replaced broken line--reestablished utility service to 30+ within 2 hrs
- Key to teardown WRM assets; disassembled/packed 5K sqft shelters--enabled redeployment $335K AF assets
- Oversaw WRM assets; located/inventoried 22.5K items--readied $15M resources for disposition/reallocation
- Enabled Iraqi Air Force Partners; trained 10 personnel on spall repair--ensured safe coalition flight operations
- Ensured proper field installation; trenched 200 ft. HV cable--eliminated K-9 facility Task Force Safe write-up
- Protected 13 mile airfield perimeter; installed nine entry gates & 50 barriers--secured IqAF tng/tactical msns
- Expertly reconstituted WRM assets; recovered 48 ECU's/12 split A/C's--$200K assets ready for redeployment
- Oversaw RMS relocation; recovered $57K A/C's; cleared 8K sq ft facility--readied for State Dept transition
- Fixed cut in main base road; 36 cu ft concrete placed/enabled electric tie-in of ILS assets--saved USF-I $100K
- Repaired tng site; created 200 sq ft parking lot--enabled instruction of life-saving TTP's to 24 coalition/Iraqis
- Trenched utility line; buried 300 ft of cable for Department of State hangar; efforts saved $10K contractor cost
- Performed sweeper ops POL facility; efforts prevented damage to fuel bladders/environmental catastrophe
- Id'd/corrected unsafe work situation; saved operator possible catastrophic accident--keeping Army/AF safe
- On alert; stopped unauthorized personnel climbing over perimeter fence; prevented possible attack on KRAB
- Security minded: moved and placed bus stop at Control Tower; increased safety/security of base populace
- Team player; assisted EOD with debris removal; hauled 30 tons; ensured on-time continuation of draw down
- Eraticated 190 airfield obstructions; recycled 1K tons material/reduced hazard--reduced airfield hazards 65
- Eliminated Vihical road safety hazards; Repaired 15 miles base roads--ensured safe travel for 6K personel
- Hauled 300 tons dirt 1K lbs trash rebuil berms; made new helocoper parking. eliminated 9 airfield write ups
- Managed EOD relocation; labored 40 hrs/connected 15 CHU's power--prepped 30 psnl living qtr's/1 mo early
- Relocated morgue; placed/level 40ft container; hauled 10 tons material-- alowing safe/secure are for our heros
- Graded 23 Miles airfield surface; eliminated 26 safety hazards--midagating possable damage Iraqi/US Aircraft
- Teamed w/HVAC; redistributed $15K a/c equip/cooled 5K sq ft--primed Post Office move to OSC-I footprint
- Executed 60hz power plant drawdown; completed 15 high-voltage splices--reduced annual USF-I costs $250K
- Salvaged material; provided 12 tons metal/enabled ballistic roof fabrication--afforded spec ops $125K assets
- Mitigated crisis; responded to IDF attack & brush fire/rerouted airfield lighting cables--supported 4K acft ops
- Refurbished MAAS; overhauled 4 runway emer cable systems/repostured trailers--redistributed $6M in IJOA
- Repaired emergency spall on runway after rocket attac; completed in 20 minets--no delay to mission

- Army infantry trained; excelled at convoy ops/urban tactics/advanced battle skills--ready for 2009 deployment
- Aced Combat Skills Trng Ft MCcoy, WI; combat life saver/convoy/weapons trng crit to Joint Svs AOR msn
- Led gravel haul team--moved 900 tns mat'l/supported Flos taxiway Navy project-- deadlines 100% on track
- Escort/ensured delivery of 900 tns of base course/select fill material for FLOLS afld proj--zero msn delays!
- Lead craftsman $475K Alpha- Zula tie-in proj; excavated 880 CM fill material--kept flying mission on sched
- Supervised 7 peers w/constr of $475K Alpha-Zula taxiway tie-in--RH #1 priority--battlefield ops ctr for afld
- Coordinated delivery of over 2K yds of base course fill material for Alpha-Zula $475K project--zero delays!
- Vital leader; supervised/ensured 180' trench was dug for new afld lighting--supported the new Alpha-Zula proj
- BAF NCO work horse of the Month! placed 1280 tns of material; set 330 ft of forms for BAF #1 priority proj
- Assisted DCP analysis/acquire CBR soil data $475K Alpha-Zulu proj--crucial for planning/meet requirement
- Led crew of six; set 3K linear ft of concrete forms for $475K proj for BAF #1 afld priority--kept proj on target
- Placed 300 + ft expansion board/finished 1220 CM of concrete for $475K project for BAF #1 airfield priority
- Led 8 pers w/construction of $475K Alpha-Zula tie-in; placed 1220 CM concrete--completed proj in 40 days
- Expertly sawcut/sealed/routed 5K ft for BAF #1 afld project; $475K Alpha-Zula tie-in --zero mishap incidents
- Supervised installation of backer rod/sealant for $475 Alpha-Zula ramp project--completed ahead of schedule
- Oversaw grading of 1K CM of base course; placed 432 CM of concrete--comp'd Bravo Keyhole proj in 3 wks
- Deployed 190 days to Bagram AB, as Airfield team leader directly supt'd OEF/OIF construction operations!
- Supervised 14 pers w/constr of $699K Bravo Keyhole--cleared 1K CM of terrain; placed 432 CM concrete!!!
- Supervised installation/alignment of 2K ft 12" concrete forms--created add'l ramp space to spt C-12 ISR msn
- Led 2 pers crew for 2K lf joint on $699K Bravo Keyhole project--prevented moisture intrusion into pavement
- Managed/mentored five Amn in upgrade training while deployed; ensured OJT/CDCs completed w/ 88% avg
- Oversaw $1.8M (LAMS) Large Area Maint Shelter pad-- created 108K sft parking taxiway for UH-60 Helo's
- Coordinated placement/finish of 42 cm conc for RH K-Span parking apron; created add'l parking for RH Mbr's
- Led eight AMN/finished 118 CM concrete for RH bed down proj--created 7K sq ft of new RH living facility!

- Planned/programmed/surveyed $5.4M worth of future constr; reviewed/corrected 6 designs/BOMs w/in 3 dys
- Multi-skilled Amn; modified 5 B-huts in 3 days; constructed 44 rms; ensured adequate living cond for RH pers
- Excavated/hauled 80K tns of mat'l; spread/compacted 300 tns of base course; fast-tracked 3 projs/$3.4M const
- Designed/constructed $796K comm fac; req'd for ILS/TACAN mx/sup't; 3X area/increased msn capability/ops
- Orchestrated shipment of 43 tns of matls/equip to 4 FOBs; critical to 6 USFOR-A projs/$2.8M worth of const
- AOR Sole machinist! Forward deployed to retrofit mast for well drilling rig--$200K replacement cost saved
- Catalyst! Completed $699K arfld const; increased arcft parking 130%enabled first MC-12W/ISR msn in OEF
- Strictly managed 80 vehicles/equip worth $8.1M; ordered $12K replace't prts/MC rate 95%; zero msn delays
- Multi-crafted Amn! Fabricated 45K lbs of steel/seamed 63 arches/erected 21 picks in 3 days; sup't $764K proj
- Team focused; delivered daily meals to 3 jobsites; acquired $300K mat'ls at CL IV; renewed $43K veh lease


- Outstanding Amn! Clearly exceeded primary duty expectations/standards of conduct during entire deployment
- Deployed 150+ days to Contingency Operating Base Speicher and Tal Afar, Iraq...directly empowered OIF
- Excelled at 30-day rigorous Combat Skills Trng at Fort McCoy, WI--ready for multi-svc missions AOR wide
- Const'd 1.5 mile rd FOB Speicher; placed 2.7K tns asphalt; $750K proj elim'd dust hazard for 1K+ vehs daily
- Key contributor on $746K OH-58 ramp project--placed 3.2K yds of concrete; expanded parking for 10 helo's
- Placed/compacted 5.2K yards base course; prep'd 140K sq' OH-58 ramp; extended COB Speicher helo cap's
- Installed 8.4K ft forms; ensured precision alignment; allowed placement of 3.2K yds concrete on OH-58 ramp
- Skillfully operated concrete saw; widened 5.8K+ ft of concrete contraction joints; eliminated water intrusion
- Superb craftsman; placed 180 tns asphalt for 12' shoulder; reduced dust...improved visibility for UH-60 helo's
- Forward deployed to Tal Afar; milled/overlaid 560K sq' runway; $2.1M proj increased acft load limit 25%
- Asphalt expert; paved 9.4K tns asphalt on Tal Afar rwy; deterred imminent afld closure; 4K+ psnl resupplied
- Superb dump truck oper; hauled 4K yds of asphalt millings for Tal Afar runway proj; ops complete in 15 days
- Installed 500 ft HESCO barriers at Tal Afar AF ECP; increased FP measures = 470 dump trucks safely insp
- Best roller oper! Compacted 9.4K tons asphalt; minimized cold joints--exceeded airfield smoothness criteria


- Deployed 225 days; led 46 CLP msns--delivered $45M in materials; supported RH constr on 4 major FOBs
- Spt'd $17M FOB Dwyer runway proj; transported Gomaco Airfield Paver across hostile enemy Afghan terrain
- Assisted w/$4.5M KAF AM-2 mat Mustang Ramp expansion--protected 33 Apache's acrft worth over $528M
- Expertly placed 500 tns base crse; erected 2/$600K K-Spans; provided new 16K sq ft RH secure storage area
- Led demolition/clearing effort; 3 mile section; Eglin AFB developed inter-service IED avoidance training crse
- True leader; worked w/EA's; marked 21K sq ft new bldgs--key for 2 KAF proj's start on time w/zero delays
- Mbr haul team; placed/graded 60 tons of gravel; improved work area/drainage for mx facility--Qol 14+ Amn
- Born leader! Ordered driver to push in "Kill Zone" during enemy small arms attack; no CLP injuries 35+ Amn
- Identified shortfalls for HD pallets/equip--ID'd $110K shortfalls--ensured Sq rdy for 2010 HQ ACC 10' ORI
- Measured/weighed/validated 140 increments for processing--established UTC compliance for ACC standards
- Lead increment mgr for D-flight; 18 increments packaged; 100% success for 18 folders/equipment items tasked
- Loader operator on ADR team; led to '10 ORI Excellent Flight rating--secured Sq ovarall rating "Satisfactory"
- Outstanding NCO; unloaded 9 pcs priority equip from C-130 acft; supported $6.1M Afghan Theater Ops projs

- Warrior ready; deployed 179 days to Joint Base Balad, Iraq in support of OIF--sustained high AF ops tempo

- Deployed 183 days to Al Dhafra AB, UAE supporting OIF/OEF/Combined Joint Task Force - Horn of Africa

- Expertly replaced damaged 410K watt generator; ensured lighting for 11M sf airfield; secured $12B+ aircraft

- Expediently built base for 60K lb mobile shooting range; graded 50 tn gravel--kept 250 SF weapons proficient

- Skillfully prepped 40K sf site/flightline DFAC; leveled 1K tons base course--saved $133K/compl'd in 5 days

- Mastered grader elevation control system; section to take on foundation projects; saved $130K dorm project

- Led concrete placement for fuel pumps; provided hardened surface for enduring operations supporting GWOT



OTHER ACCOMPLISHMENTS:

- Served as VCNO; managed 100 vehicle fleet; fabricated water trailer--enabled return of $30K monthly rental

- Const 6-acre sports ctr; softball/basketball/volleyball; morale boost for 1.9K--Nov '07 MSG Team of Month




We need more examples. Bullet statements may be contributed using this form. Thanks!