eprbulletsafsc.com

AFSC 3E5X1 Engineering EPR Bullets


Key Duties

- Conducts facility surveys & preliminary engineering site inspections; supporting the AF's #1 deployed wg/968 sq yds
- NCOIC assistant & directs 3 mil; provides CAD drafting & mapping capes for proj development to spt $1.3B budget
- Prime Beef Engineer Emergency Force team member; deploys in support of AEF/USSOCOM mission requirements
- Prime BEEF trainer; coordinates AFSC upgrade training & contingency activities for 15 mil mbrs through 6 sections

- Assists NCOIC/supervises 9 Amn/provides drafting/mapping capes for project development to support $1.3B budget
- Focuses Geographic Info Sys to deliver mapping reqmts for $19.1M infrastructure expenditures/970 bldgs/6.6K acres
- Conducts facility surveys & preliminary site inspections; supporting 76 acft/968 sq yd airfield/AF's most deployed Wg
- Supervises 1 engineering tech to provide drafting & mapping capes for project development to support $1.3B budget

- Develops/conducts lesson plans; trains/instructs on AFSC core tasks; evaluates personnel for skill level upgrade

- Assigned to Prime BEEF mobility team E1, ready to deploy at a moments notice to project global reach/power

- Geobase NCOIC--supervises 7 Amn; oversees the development/management of base maps and the JBER CIP

- Leads/conducts plane/geographic/geodetic surveys; incorporates all spatial data into base mapping platforms


Accomplishments

- Oversaw crane waiver prgm; liased w/14 orgs, drafted 2 obstruction pkgs--fortified 17 ktrs/val'd 5K req'd flying hrs/yr

- Led 2-hr contingency trng; prep'd 11 Amn for ADAT proc--boosted shop capes 5%/ensured efficient UXO & fac recce

- 1st choice for interim NCOIC/8 wks; directed 4 Amn/44 civil design projs/$1.2M--vital to AFSOC '20 CE Sq Yr Awd
- 1st class NCO; industrious/hard-working beyond expectation; ready for a large section--TSgt selection a must!

- Accelerated UGT; instructed 9 Amn AFS core tasks over 72 hrs--increased shop capes by 15%/2 Amn fully upgraded
- Aced 24-hr radiation safety course--fully qualified to perform precision construction measurements worldwide
- Aced 3 Trimble surveying eqpt online courses; learned/taught enhanced techniques--bolstered shop capes 5%
- Advance CIP; maintained critical data for 8 mi/119K ft² pavements/778 bldgs/43 mi utilities--est'd 5-yr expansion plan
- AFS lead on $65K remodel proj; led 5 Amn/coord'd w/5 crafts on 5.6K ft² renovation--devised mtg forum for 274 pers
- Aided site layout on $927K Supply admin/storage facilities--yielded critical depot for combat mission supplies
- Attended 4-day professional enhancement seminar--polished team-building, bullet writing & supervisory skills
- Authored map books; dsgn'd 17 guides f/28 escorts--empowered mobility f/$38.2M construction projs/5K flying hrs/yr
- Avid booster club supporter; advertised/sold holiday party tickets--$5k rasied toward event; boosted CE moral

- Calculated detailed magnet school estimates; presented 2 pers/material plans to sq CC--unveiled $17K in savings
- Chaired $3.5M afld sunshade project; led 7 mil/ID'd/repaired 29 afld discrepancies--enabled 5th gen acft deployed fleet
- Completed 3 Trimble equipment online classes; learned & taught enhanced techniques--boosted shop capes 5%
- Completed 61 semester hours of CCAF AS degree, in Construction Technology, maintained a GPA of 3.8
- Conducted ramp parking survey; collected 30 pts/created new paint design--provided new arcrft parking area
- Coordinated 2-day Korean War POW/MIA vigil; 14-mbr team honored 8K vets--"Aviano's Finest" recognition
- Crafted FY18 IPL; created 14 projs/$8.9M f/AFCENT funding--spt'd $143M Master Plan/Wg/CC "Best seen to date"
- Critical to $50K contractor vs. in-house cost savings; trained 3 Amn on $21K design--mitigated FDEP $25K fine/day
- Critical to $50K ktr vs. in-house savings; trn'd 3 pers/finalized crit $21K drainage design--nixed FDEP $25K fine/day

- Dedicated 300 hrs to TXDOT/TTI crs; achieved civil engineer/project mgt certs--enhanced career knowledge/toolbox
- Dedicated pro; motivated in challenging aspects of engineering assistant career field--promote ahead of peers!
- Demolished 7 condemned facs; prepped $52K asbestos remediation--6K sf redux, tackled AF 20/20 initiative
- Deployed 177 days ISO Op SPARTAN SHIELD; EA shift lead/mng'd 5 engineers--spt'd 483K cmbt sorties/18 EKIA
- Deployed NCOIC ISO Op SPARTAN SHIELD/211 days; led 9 EA's/spt'd 50 projs--enabled 1.1K cmbt sort/18 EKIA
- Designed $5.7M afld proj; sited 7 hangars, survey'd 411K sq ft ramp--2x ramp space f/7 MQ-9/MQ-1 UAV beddown
- Designed 2 schools/2 clinics; drafted 50+ drawings--provided education/med care 450K impoverished LN's
- Designed 92K sqft LSA expansion; secured $378K funds--increased lodging cap 12%/spt'd 900 pers surge all <3wk!
- Designed light sys upgrade at 3 GSUs; slashed 364K kWH, $2M yearly--5 yrs ahead of DoD 2020 energy redux goal
- Devised helo LZ design; created $1.4M plan/sync'd jt reqmts/guided 594K ft² build--increased evac response time 40%
- Directed $3.5M afld sunshade proj; surveyed/ID'd 29 afld discreps/advised 3 rpr COAs--paved way for 5th gen acft ops
- Directed 20th Street project survey; gathered utilities info/200+ topo pts/86k sf--saved $300K in contract costs
- Directed CIP sys; sustained 6.6K acres/970 bldgs/583K mi utility data--enabled $207M/74 proj prgm/AF's 3rd lrgst Wg
- Directed fuel farm upgrade; led 3 Amn/leveled 9 berms--safed 2M gal/incrs'd fuel supply 150%/postured O-plan surge
- Drafted $194M KC-46 beddown projs; sited 2.1M sf free zone/debris haul route--expedited const/FY16 ready
- Drove $125K marina proj; led 3 pers/drafted 4 designs--ensured $680K yrly profit/QoL for 25K/earned Amn of 3rd Qtr
- Drove $2.2M K-span proj; tm'd w/1 ECEG/sited 2K points/analyzed 20 soil tests--expanded multi acft mx capes 22K ft²
- Drove $415K bldg dwg contract; set timeline/mng'd 6 mil/163 facilities--reduced time 20%/averted $163K add'l costs
- Drove base road survey; captured 1.5K pts/188K sf asphalt--saved $44.8K/sq Amn 2nd Qtr '14...ready for SrA
- Drove Hurricane rcvry; led 8/ID'd $300K bridge rpr/safed 200K/wkly commuters--captured AFSOC CE '20 Sq of Yr
- Drove hurricane rcvy; mng'd 21 pers/expedited survey/ID'd $500K bridge damage--protected 200K commuters/week

- Engineer Flight VCO--monitored 6-vehicle/$142K account--assured squadron resources promptly available
- EOC AFS lead during JBER windstorm; oversaw 3 amn/damage tracker/map support--lauded by EOC director
- Erected $150K MSA fence; directed 6 mbrs/18 insps/mapped 15 sites--secured $109M muns/readied ACE msn tasks
- Est'd PSAB's 1st jt force response across 8 AoRs; led 3/elevated op capes 20%--coined by Brig Gen, SFS/CC & CE/CC
- Excellent engineering support for $9.4M construction prgm--expedited project planning & design for site leads
- Executed 1.6M sf runway survey; located 2.7K spalls--addressed 51 FW/CC #1 priority/averted costly closure
- Executed 200K sq ft topographic survey; data ID'd housing flood areas for rpr--saved $250K in contract costs

- Facilitated $616K renovation; procured crit workspace, prevented 5 mo delay/termination--lauded by USAFE
- Facilitated KMC eqpmt inventory tm; validated 21 new fac loc's/five utility sys's--ensured $8M for future RAB proj's
- Facilitated Wing Drug Reduction program; observed 57 urinalysis tests--enhanced substance abuse prevention
- Filled Sq Training Manager billet; coord'd heavy eqpmt certification f/17 mbrs--increas'd snow team man-power 20%
- Fixed elevation discrepency; teamed w/ South Dakota ARNG--erased 2 wk proj delay; garnered warrior of wk
- Flawlessly emplaced four survey control points--increased Taji control precision from 10m to less than 2cm
- Fostered NED/Belgian AF partnership; engineered 30K SF $308K emergency taxiway repairs--safed 6 F-16s/$113M

- Gained invaluable knowledge; completed 20-hr Skillsoft Leading w/o Authority--intensified leadership skills
- Guided $340K MFH paint restoration; inspected 3 facs/120K sq ft daily--improv'd QoL for 432 Amn residents
- Guided 4 Amn/$415K contract; updated 163 floor plans/60 hrs--saved $163K add'l costs/solidified 8K in mil funding
- Guided fuel farm repair; led 3 mbrs/fixed 9 berms--safed 2M gal/increased fuel supply 150%/postured for O-Plan surge

- Hand-picked interim NCOIC for 8 wks; directed 4 Amn/completed 44 jobs/$1.2M--vital to AFSOC '20 CE Sq Yr Awd
- Headed hurricane rcvy; instructed 21 mil/expedited survey/ID'd $500K bridge damage--safed 200K commuters/week

- Inspected Golf crs ofc/$105K; enabled modified roof and vent sys/6K sq ft--averted future leaks/deterioration
- Inspired excellence; wrote 4 EPR's/10 award nominations--8 winners, 1 USAFE AOQ, 1 Wg civilian of Qtr
- Installed six prsnl doors; replaced damaged/inefficient doors--crucial security & energy vulnerabilities averted
- Invaluable knowledge; completed 40-hr Radiation Safety Officer trng--earned American Concrete Institute cert

- Key mbr, Jt Capability Technology Demo; eval'd afld damage rpr equip/materiel--set stage for future upgrades
- Key member Sq proj review board; expedited 35 DSWs/24 work orders/18 MACC proj's--shield'd constr for 71 bldgs
- Key player in Rockex exercise; gained zero deficiencies in processing line--maintained LRAFB excellent rating
- Key to $228K asbestos abatement; designed 2 dorm demo/47K ft² redux--increased life/health/safety for 135 residents
- Knocked out 65 work orders; accomplished 70 hrs of afld survey--bolstered $17M afld pavement/striping projects

- Laid out 37K sf bazaar--wg raised $84K, benefited 8.5K-mbrs; operated Aviano's booster club --raised $910
- Launched sq fire extinguisher trainer class; enabled 7 safety reps to train Amn--base-wide life saving potential
- Lead design EA on $927K Supply admin/storage facilities--yielded critical depot for combat mission supplies
- Lead eng tech for $65K Checkpoint Five K-Span--improved RH increment inspection before aircraft loading
- Lead insp f/$630K CDC reno; rpr'd deteriorating fac/15 rooms--ensured safety f/150 kids/lauded by Director
- Lead trainer for 5 mil; est'd trng/certified 94 tasks/mentored 2 on CCAF--secured journeymans/adv'd degrees by 16%
- Led $1.1M Air & Space Museum proj; conducted daily MILCON insps-- enhanced exp f/100K visitors yrly
- Led $310K Chapel renovation; conducted 90 site inspections/replaced 22K sq ft roof--improv'd QoL/500 pers
- Led 12 engineering assistants; mng'd 58 construction projects worth $63M--spt'd $165M MILCON prgm/$1.7B assets
- Led 20th Street construction survey; gathered utilities info/200+ topo pts/86k sf--saved $300K in contract costs
- Led 4-pers acft mishap survey team; completed 2 crash scenarios/bio-safety tng--ensured shop disaster readiness Rdy
- Led 7-man team; surveyed Class B a/c mishap, ID'd 20 rwy hazards, 4 BAK-12--cut 2 wks/$5K contract costs
- Led Chabelley Afld infra survey; pulled 15 as-builts/334 objects/14K items--secur'd $2.5M facility sustainment funds
- Led contingency crash survey training; marked 31 pts covering 95k sf--9 pers shop contingency training ensured
- Led expedient site layouts on $1.1M CSAR admin/storage facilities--yielded critical depot for combat mission
- Led flight UGT/9 Amn; dvlp'd comprehensive trng plan/certified 47 core tasks--secured 5-skill lvl for 4 AD/1 Guard
- Led JBER Airshow pedestrian parking survey; staked out 9k spaces & 500 pts--maximiz'd visitor access/safety
- Led jt svc survey tm; trn'd 2 mbrs mapping/GPS equip/site-prep ops--incrs'd interoperability/enabled 60 pers beddown
- Led New Horizons msx survey team; singlehandedly sited 32K sf/$XXK facilities--accelerated schedule 10%
- Led redesign of floor/site plan for $676K logistics bldg; sited add'l 20K SF--vital component to unit readiness
- Led three flt mbrs in retreat flag detail; executed movements with precision--upheld AF heritage and traditions
- Led UGT/5 Amn; built trng plan/certified 94 tasks/counseled 2 on CCAF--secured journeyman/adv'd degrees by 16%

- Managed $25M HN runway rpr; partnered w/USACE & 5 coalition nations--enabled $1.1B acft/6K combat sorties/yr
- Managed 5 construction projs/$1.2M; conducted 300 QA/QC inspections--ensured 100% on-time completion
- Managed BDOC relocation; staked 175 ft cable, 640 sq ft structure, $58.5K assets--amplified RAB base defense msn
- Managed JBER Arctic Thunder survey; marked 48 acrft parking locations/68 booths--enjoyed by 200k+ locals
- Mission focused w/results--willing and capable of taking on more demanding and challenging tasks--promote!
- Motivated team player--deployed equip custodian--efforts support $60K of equip New Horizon deployment

- Optimized LAFB HQ building; designed 621sq ft floorplan/11 new work stations--increased unit production by 37%
- Organized 2, participated in 4 base cleanups; spent 22 hrs ridding base of weeds/trash-boosted environment/aesthetics
- Organized 272 acre AFCEC survey; captured 20K data points--prevent'd 6 month contract delay f/$143M const prgm
- Organized 820 Red Horse Squadron day; football competition--promoted unit cohesion & build esprit de corps
- Oversaw $1.1M FPS install; reviewed/approved 11 product submittals--protected comm bldgs worth $10.3M
- Oversaw $666K warehouse electrical proj; safeguarded $5M in equip--energy reduction saved AF $172K/yr
- Oversaw GeoBase Program; complet'd 120 GIS requests/500 maps--supported 1.6K prsnl/436 facilities/18 acft assets
- Oversaw JBER site summit survey; led 4 pers survey team/placed 75 points--$1.8M installation range secured
- Oversaw JBER street sign survey; collected 10K safety/GPS data points--90 days ahead of HQ req'd time line

- Participated in 2K ft sidewalk proj; placed $34K concrete/50-ton topsoil--safe path for 10K APEC spectators
- Participated in Airmen Committed to Excellence burger burn fundraiser--sales generated proceeds over $500
- Performed laboratory MC tests on RH quarry base coarse--ensured product IAW EPA dust emission standard
- Piloted 31 pers emer plan; crafted base flood map/129 bldgs/23M ft²--nixed vulnerabilities for $731M AFSOC bldgs
- Piloted high-vis Wg bldg rpr/12K sq ft/$206K; extend'd roof life expectancy 3 yrs--improv'd QoL for 200 pers
- Projects positive leadership/in-depth technical knowledge; highly respected by peers--promote to MSgt now!
- Proven track record; meets all challenges head on, prepared for additional duties--promote when eligible
- PTL B Certified! Led 12 PT sessions; coordinated sports days/high intensity workout--improved unit fitness/morale

- QA'd $3M afld spt contract; coord'd 53 rqmts, 354 line items--safed 10 sites across 5 African nations, 600 sorties/mo
- QB'd CENTCOM/CC #1 pri; sited $400K radar area/prepped $2B MWS platform--vital to AFSOC '20 CE Sq Yr Awd
- QB'd CENTCOM/CC #1 priority; prep'd $400K proj site for $2B missile platform--garnered ALS Distinguished Grad!

- Recuperated 3-shop equip account; removed $10K obsolete assets/fixed 26-yr oversight--saved 32 man-hrs/yr
- Represented AF at joint 3 week Army Warrior Leadership Course--lauded for leadership/coined by Wg/CCC

- Self starter! Tm'd w/SFS/trn'd 4 Amn/sketched 4 accidents/89K ft²--saved 160 hrs/upped investigation verdict by 85%
- Selfless! Planned multiple Special Olympic events--improved spirits of disadvantaged local children & adults
- Skillfully surveyed 43K SF for $706K compound paving proj--mitigated further road degradation/veh damage
- SME for Operational Test Agency; trained ktrs on disaster control ctr set-up/ops--enabled incident response tm
- Spearheaded hurricane recovery; mng'd 6 pers/ID'd $500K damage/awd'd $110K contract--safed 200K commuters/wk
- Spt'd Chabelley airfield master area plan; survey'd 4K pts, creat'd 24 maps--shap'd East Africa's security f/next 25 yrs
- Steer'd Wg plans; executed 29 projs/$6.26M & prep'd 8 projs/$12.9M f/execution--coined by AFCENT ARC Advisor
- Steered $3.6M UH-60 ramp construction; piloted 643K ft² civil design--safed $213M acft/coined by deployed CE/CC
- Steered $415K A&E contract; prepped 2M ft²/163 bldg dwgs--ensured 8.1K pers duly funded/saved $163K add'tl costs
- Stepped up and accomplished ACI Aggregate Technician course--sharpened proficiency in critical job skills
- Stood-up R&O section; created 33 crit fire drawings f/new fac--protected 35 prsnl, met strict German/US safety regs
- Strives for constant self improvement; completed Auto CAD civil 3D class--enhanced job skill and knowledge
- Successfully completed ACI Concrete Field Testing Tech course--sharpened proficiency in critical job skills
- Supervised $5.9M afld drainage; led 2 project insps/ID d 4 discrepancies--prevented AETC training Flt flood damage
- Surveyed 147K sq ft afld; collected 4K grnd elevation pts/40 acft parkings--vital to afld drainage projs/$797K
- Surveyed 950 CY of concrete; Live Ordnance Loading Apron--ensured ordnance safety during pilot exercises
- Synchronized w/SFS; trn'd 4 Amn/sketched 4 mishaps/89K ft²--slashed 160 hrs/fast-tracked investigation verdict 85%

- Tackled $8.7M FP job; sited 2.8K barriers/53 bunkers--enabled 75 daily searches/mitigated blast hazard for 2.5K mbrs
- Take charge, high-performance leader; Gp CCC lauded best training pgm 2-yrs running--promote to TSgt now!
- Team player! Enthusiastic participant in Stomp Out Violence 5K run--boosted esprit de corps within Eng flight
- Trained Surinam army advanced surveying techniques; staked out 3 sites/20K sf--bolstered foreign relations
- Trained three 3-lvl amn; oversaw 120 survey hrs/database upload--enhanced shop efficiency/amn upgrade training

- Volunteered to be unit Physical Training Leader, leading by example, and earning a 99 on the fit to fight test
- Zealously served 50 hrs community svc; provided svc as designated driver--saved life/career of pers/amplified morale



Bullet statements may be contributed using this form. Thanks!