eprbulletsafsc.com

2P0X1 PMEL EPR Bullets


PMEL/TMDE Duty Descriptions


- #1/23 MSgts; expedited transponder mx/asset to AOR--predator FMC...exemplary warrior/must promote now!
- #1 of 133 Amn! Calibrated 50 equip-items this qtr...highest among peers--100% QA pass rate on three insps
- #2 of 26 MSgts; diverse/dynamic SNCO--MXS Top 3 Treasurer & MXS SNCO of 4Q09...promote this board!
- #2 of 42 MSgts/MXS SNCO of Yr '09; superb ldr, driven to success, no challenges too tough--SMSgt this brd!

- #28/376 MSgts in AF largest AW...proven ldrship record; 86 MXG SNCO of 4Q09--SMSgt stripes this cycle!
- #6 of 27 sq MSgts; handpicked as temp sq 1st Sgt...SMSgt position; filled 2-mo vacancy--make a SMSgt now!
- 56 CMS Top 3 Pres; increased membership participation 15%; organized two fundraisers--$2.4K for awards
- 86 MXS PTL; led conditioning of 256 personnel during fitness events/testing--linchpin to sq 99% PT pass rate





- Accomplished 5 hrs of leadership trng; loaded supervisory toolbox--advanced verbal/counseling/writing skills
- Accomplished three QA insps; zero process errors/100% quality pass rate--exceeded AF/flight goals by 10%
- Achieved 100% critical quality rate on 10 inspections; element quality rate 100% in Sep 2009--beat std by 5%
- Achieved 100% pass rate on four QA inspections; flt's 12-mos pass rate 93%--best TMDE lab avg in USAFE

- Achieved 100% QA pass rate on 10 insps; element's quality 100%, Dec 08 & Apr 09--beat flight goal by 5%
- Achieved 100% QA pass rate on 15 insps; contributed to flt's 93% pass rate--earned 2d qtr '09 QA Honor Roll
- Achieved 100% QA pass rate on two inspections; launched flt quality pass rate to 96%--crushed AF 90% goal
- Achieved 100% QA rate; 3 perfect insps--helped flt achieve flawless QA rate Feb/Jun '10...best seen in 2 yrs

- Achieved 100% quality on five insps; instrumental to Osan PMEL 100% quality rate--crushed AF 90% average
- Achieved 100% quality rate; zero defects on seven insps--aided flt's 100% QA rate Feb & Jun '10/best in 2 yrs
- Achieved 92% QA rate; named for exceptional mx...86 MXG "Honor Roll"--aided '09 UCI sq/grp "Excellent"
- Achieved 98% pass rate on 55 quality inspections; raised flight's pass rate to 92%--surpassed AF goal of 90%

- Acquired computer mx software; repaired 26 computers/built electronic TODO library--saved 72 man-hrs/mo
- Adjusted distortion analyzer; enabled accurate signal measurements--provided mission support for Incirlik AB
- Adjusted lab signal generator; supported 20 spectrum analyzer calibrations--sustained C4I ops across 8 bases
- AFSO21 minded; applied lean principles/re-org'd packing process--improved flow/cut processing time 20%

- Aided 52 FW surface plate cal; allowed crucial acft brake drum tests--guaranteed F-16/A-10 aircrew safety
- Aided flight network switch installation; re-named LAN computers/re-routed printers--min network down-time
- Aligned 52 AMXS eng warning test set; restored A-10/F-16 turbine mx--ensured on-time OIF deployment spt
- Aligned 52 FW acft weighing system; 8-hr task completed <4 hrs--allowed weight and balance of eight F-16s

- Aligned 52 FW aft boresite fixture; completed while customer waited--returned two grounded F-16 acft FMC
- Aligned 52 FW priority spectrum analyzer; returned countermeasures station to FMC--allowed mx on 40 pods
- Aligned 52 FW radar tester; avoided acft Identify/Friend or Foe insp delays--20 F-16 pre-flt checks complete
- Aligned 52 FW weighing system; completed in 4 hrs...2 hrs ahead of schedule--allowed wt/balance of 8 F-16s

- Aligned 606 ACS o'scope; facilitated radar mx/restored C2 over southwest Asia AOR--promote to BTZ now!
- Aligned 86 AW decelerometer; restored rwy condition insp ability--guaranteed rwy safety for aircraft & pilots
- Aligned 86 AW emer radar tester; ensured wg's 1st all AF active duty C-130J ISO insp completion--promote!
- Aligned Al-Udeid current amp; restored AOR capability--saved 2-wk ship time...spt'd 26 msn critical items

- Aligned emer missile test set; enabled AIM-9 guidance system tests--restored mx on 140 war-readiness assets
- Aligned four comm test sets; ensured AOR radio mx/air-to-grnd comm--facilitated coalition combat air strikes
- Aligned four meter calibrators; completed in 1/2 of norm--restored USAFE/AFCENT meter testing--promote!
- Aligned guidance missile tester; enabled 52 FW munitions mx for 22 A-10s--acft MC/averted msn sortie delay

- Aligned lab's frequency synthesizer; restored element's integral counter test console--facilitated 37 calibrations
- Aligned NATO priority signal generator; restored Pirmasens Polygon EW rang--zero trng delays for 19 nations
- Aligned one-of-a-kind weapons control tester; alleviated downtime for 22 A-10 munition circuit verifications
- Aligned priority navigation test set; restored grounded U-2 to FMC--spt'd Project Olive Harvest recon mission

- Aligned priority stray voltage tester; sole available asset for aim-9 missile system--OIF/OEF F-16's supported
- Aligned radar tester; enabled identification friend/foe pre-flt sims--enhanced aircrew safety for OEF/OIF msn
- Aligned spark gap test set; critical to insulation breakdown test set high voltage ops--ensured personnel safety
- Aligned stores release equipment test set; re-established 52 FW missile pylon mx capability--promote to SSgt

- Aligned three msn essential 52 FW wpn testers; restored F-16 missile mx--zero delay for OEF/OIF deployment
- Aligned two Al Udeid PMEL pressure stds; required for 60% of flt workload--already performs at TSgt level!
- Aligned two voltage testers; restored 52 EMS line replaceable unit test capabilities--90 verifications on time
- Ambassador! Hosted Pakistan AF PMEL delegation for 2 weeks; provided three officers tech/mgmt guidance

- Analyzed flt's quality manual; 59 inputs implemented--unified five mx guides into one...standardized processes
- Analyzed ISO reconstitution plan; developed 36 man capability <45 days--prepared for C-130J insp transition
- Arranged priority shipping; worked w/TMO for long-term transfer of cal'd TMDE--168 off-station OWCs spt'd
- Assisted 10 nations w/45-member cell phone acquisition; allowed lcl/int'l HHQ's contact--zero lost capability

- Assisted NCO during on-site cal; verified essential TMO pallet scale--restored sole asset for precise weighing
- Assisted physical/dimensional element; calibrated msn essential dynamometer--restored AOR KC-135 eng mx
- Assisted w/flt's surface plate cal; permitted crucial C-130 brake flatness tests--guaranteed 118 pads verified
- Assisted w/Pakistan AF delegation; trained tech on torque cal & repair--expedited F-16 FMS to key OCO ally

- Attacked element's deficiencies; raised 9 technicians' quality awareness--element QA rate 100%;10-month high
- Attained amazing 100% quality pass rate on eight insps; augmented flt's 91% quality rate--best avg in USAFE
- Attended Access course; revamped flt CDC pretest prgm--ensured accuracy of 205 questions/92% flt exam avg
- Attended AFSO 21 trng; applied to root cause analysis process--eliminated spt equip documentation write-ups

- Attended AFSO21 & 6S trng; whetted visual mgmt skill-set--reinvigorated grp acft wash process improvement
- Attended AFSO21 class/completed process improvement course; led section LEAN event--production up 25%
- Attended AFSO21/6S trng; whetted visual mgmt skill-set--cemented flt merger/cross-utilized AFSCs for msns
- Attended base records mgmt trng; improved files accountability understanding--ensured compliance/standards

- Attended Excel class; developed calibration spreadsheet--slashed measuring receiver calculation time by 50%
- Augmented 56 CMS pro supers; contributed to 400 pilots/crew chiefs trained--7.5K sorties flown...promote!
- Augmented element during manning shortage; bolstered production by 16%--aided backlog reduction by 300%
- Augmented intra-service spt; arranged facility/stds use--Army TMDE MC...enabled cal of transmission test set

- Authenticated msn-critical o'scope; integral component on threat radar stations--returned 52 FW ECM's FMC
- Authored Best Practices; consolidated flt/slashed prgms 63 to 21--USAFE approved/competing at AF level
- Authored mx request for 24" fuselage crack; executed AF approved repair--launched final C-130E ISO on time





- BMT Honor Graduate & Distinguished Grad for 9-mos Basic Electronics Tech Trng--best choice for SrA BTZ





- Cal'd 155 TMDE; QA eval'd 13Xs...amazing 92.3% pass rate/best of 24 peers--flt equip availability rate 97%
- Cal'd 52 FW hydrazine tester; ensured pre-flt insp of emer power unit--guaranteed pilot safety...16 F-16s spt'd
- Cal'd emergency alt/airspeed tester; restored flt cntrl sys testing capability--on-time mx kept 16 C-130s MC
- Cal'd lab angular equip; restored acft gunners quadrant test cap--delivered precise A-10 Howitzer ordinance

- Cal'd lab deployable generator; enabled PMEL TDY/3 U-2 assets verified; spt'd Proj Olive Harvest...promote
- Cal'd msn critical pressure gage; returned 52 FW acft arresting sys FMC--enabled continuous sortie generation
- Calibrated 111 equip-items; executed mx on six msn priorities--incr'd equip availability rate from 93 to 97%
- Calibrated 152 TMDE items; drove flt achievement of 2-day turn-time--wg equip avail rate 97%/std bested 4%

- Calibrated 168 TMDE; executed nine AOR/five priotities--equip availability rate 96%...bested AF std by 3%
- Calibrated 52 CS freq counter; restored mx on microwave sensor for 84 secured facilities--OPSEC maintained
- Calibrated 52 EMS priority checking fixture; enabled 20 mm gun inspection--ensured 16 F-16s remained FMC
- Calibrated 52 FW emer checking fixture; enabled 20 mm gun inspection/installation--ensured 45 F-16's FMC

- Calibrated 52 FW hydrazine test set; ensured pre-flt insp of emer power unit--assured F-16/aircrew mbr safety
- Calibrated 52 FW msn essential electrical test set; enabled on-acft threat testing--unhindered A-10 generation
- Calibrated 52 FW priority spectrum analyzer; ECM station returned FMC--ensured verification of 40 EW pods
- Calibrated 606 ACS emer priority scopemeter; cemented on-time Kandahar AB deployment--promote to TSgt!

- Calibrated 63 TMDE assets at Osan AB; contributed to flt's 96% equip availability rate--smashed AF 93% std
- Calibrated 66 equip-items w/zero defects; drove flt attainment of 2-day turn-time 'Jun '09--beat AF 7-day goal
- Calibrated 86 AMXS emer data bus tester; initiated short circuit harness tests for J-models--grounded acft MC
- Calibrated 86 MXS fuel shop's vital gas monitors; ensured safe JP8 levels--allowed uninterrupted fuel cell mx

- Calibrated Avionics' pulse generator; returned EW test/verification capabilities FMC--enabled testing 40 pods
- Calibrated Balad msn essential radio test set; restored radar surveillance diagnostics FMC--promote to SSgt!
- Calibrated balance analyzer; restored props insp/mx capability--three C-130s tested/ensured OIF msn success
- Calibrated digital computer test set; permitted field-level munition system memory reprogramming verification

- Calibrated emer priority oxygen field tester; restored ejector seat O2 lvl insp's--returned 91 acft regulators MC
- Calibrated four high-use laboratory pressure standards; allowed verification of 550+ pieces of pressure TMDE
- Calibrated high-use measurement std; completed in 1/2 alloted time--enabled 168 calibrations...promote now!
- Calibrated lab torque station; restored PMEL torque measurement capability--enabled 275 TMDE verifications

- Calibrated lab's high-use pressure std; 7-lvl core task--averted bottlenecks/facilitated mx on 550 equip-items
- Calibrated mission-essential countermeasure dispenser test set in 5 hours; allowed 52 FW on-time deployment
- Calibrated nine 703 MUNS items; ensured non-stop mx on NATO $500M wpns stockpile--promote with peers
- Calibrated non-flexible cable pull tester; enabled req'd checks--C-130 flight control system integrity verified

- Calibrated oxygen test set; allowed 52 FW's pre-flt insp/mx of O2 regulator--ensured F-16/A-10 pilots safety
- Calibrated Pirmasens radar sys freq counter; restored NATO EW trng sys mx--no training delays for 19 nations
- Calibrated priority 52 FW exhaust gage; completed 3 days ahead of schedule--averted F-16 eng work stoppage
- Calibrated priority radar threat simulator; restored 52 FW detection sys...16 F-16s verified--promotion a must

- Calibrated priority weight transducer kit; restored Balad AB F-16 weight & balance check capability--promote
- Calibrated radar sys signal generator; maintained comm link--ensured uninterrupted multinational aircrew trng
- Calibrated radio surveillance test set for Balad AB; expedited return to warfighters/spt'd OCO msn...promote
- Calibrated seven lab signal generators; enhanced tactical air navigation testing--allowed all-weather flight ops

- Calibrated stray voltage detector; key to acft weapons' safety--assured non-stop F-16 electrical system testing
- Calibrated three emer priority gauges; returned acft arresting system FMC--ensured safety of >$768M in assets
- Calibrated vibration pick-up; returned Al Udeid's test cell FMC--prevented eng test delays promote w/peers
- Calibrated vital pulse counter; returned 52 FW's radar test site to FMC--ensured continuous acft EW threat trng

- Calibrated/aligned critical 52 FW props balance; enabled accurate non-stop weighing of F-16 engine blades
- Calibrated/standardized lab torque std; restored torque measurement cap--facilitated mx on 500+ equip-items
- Certifed emer pressure test set; aided 12 A-10 acft altitude/air speed checks--critical 48 hr TCTO updates c/w
- Certified 101 TMDE-items including five lab stds; drove flt's equip availability rate 96%--beat AF std by 3%

- Certified 117 TMDE; included 23 lab stds/2 priorities; flight's equip availability rate 96%...beat AF std by 3%
- Certified 140 DC/low freq TMDE items; included two priorities & 23 CRF assets--outproduced peers by 25%
- Certified 145 TMDE; included 11 CRF/10 lab stds; incr'd lab equip availability rate to 96%--beat AF 93% std
- Certified 248 items/3 priority cals/16 lab stds; increased flt's equip availability rate to 97%--beat AF 93% std

- Certified 313 equip-items; performed four emergency mx actions--wg equip avail rate 97%/beat AF std by 4%
- Certified 350 TMDE items; 10 wg/21 AOR priorities--drove 96% equip availability rate...beat AF std by 3%
- Certified 36 TMDE, plus 3 pri/2 lab std/4 CRF; drove wg's equip availability rate 97%--beat AF std of 93%
- Certified 52 FW emer radio test set; restored comm fault detection capability MC--spt'd 3 AMUs/60 CAF acft

- Certified 52 FW pressure tester; allowed altitude/airspeed controls pre-flt verification--A-10 fleet supported
- Certified 52 FW radar tester; enabled identification friend/foe mx--20 F-16s pre-flt checks done...TSgt a must!
- Certified 52 FW's emer oxygen test set; insp'd/adjusted regulators--aided on-time deployment of 15 F-16 acft
- Certified 56 equip-items w/zero discrepancies; helped reduce backlog to 4.9 days--flt crushed AF 7-day avg

- Certified 570 TMDE...21 lab stds/27 AOR items; increased lab equip availability rate 96%--3% above AF std
- Certified 71 complex TMDE; 21 lab stds/5 emer priorities included--facilitated 50% reduction in flt backlog
- Certified 71 equip-items, plus 21 lab stds/5 priorities; provided core task section trng--cut backlog 6 to 3 days
- Certified 71 TMDE w/four priorities/two AOR items; drove equip availability rate to 96%--beat AF 93% std

- Certified 74 TMDE w/five lab stds/three AOR items--drove equip availability rate to 96%--beat AF 93% std
- Certified 82 complex TMDE in 7 mos; incl'd 4 priorities/10 CRF--equip availability rate incr from 93 to 95%
- Certified 85 TMDE items/12 CRF/4 priority cals--incr'd flt's equip availability rate to 97%...beat AF 93% std
- Certified 91 TMDE assets...7 lab stds/4 priorities; incr'd flt's equip availability rate to 97%--beat AF 93% std

- Certified 96 TMDE assets; including 11 CRF/10 lab stds; incr equip availability rate to 96%--beat AF 93% std
- Certified AF sole indoor C-130 test cell; finished in 2 days...1/2 allotted time--restored 86 MXS engine testing
- Certified Al Udeid meter calibrator; eliminated lateral spt of 215 AOR items--selected SrA Below-the-Zone!
- Certified AOR's sole C-130 test cell; resolved fuel flow measurement shortfall--28 engines returned to service

- Certified eight complex lab stds across two flt elements; enabled 155 cals--30 work centers spt'd w/MC equip
- Certified emer avionics test station spectrum analyzer; averted work stoppage--four test stations MC--promote!
- Certified emer balance analyzer calibration; restored Kandahar Predator engine mx--prevented OEF msn fail
- Certified emer night vision tester; restored Balad F-16 mx capability--SSgt who performs at TSgt lvl...promote

- Certified emergency vibration pick-up; restored Al Udied engine testing FMC--eliminated OIF engine backlog
- Certified essential signal generator; key for radar system--ensured uninterrupted EW multinational aircrew trng
- Certified F-16 test cell; trained two 7-levels...flt qualification up 100%--returned 52 FW engine testing FMC
- Certified fail-safe ohmmeter; 52 EMS field training uninterrupted--AIM-9 work-station ground chks completed

- Certified four critical lab stds; facilitated 300 calibrations--decr'd backlog from 10 to 5 days...beat 7-day goal
- Certified lab pressure standard; restored alt/airspeed test set calibration capability...enabled 63 cals--promote
- Certified lab's mobile torque station; required for semi-annual TDY--supported Project Olive Harvest U-2 ops
- Certified msn critical radio test set; enabled radar surveillance diagnostic ability--ensured secure OIF airspace

- Certified msn-essential torque wrench; completed 1 wk early--allowed 52 FW on-time deployment of 20 F-16s
- Certified on all 60 5-lvl core tasks; done w/100% OJT/CDC rqmt in 65% of allotted time--12% ahead of peers
- Certified on unique night vision test sets; increased task coverage 50%--ensured 100% night vision availability
- Certified priority 52 CMS spectrum analyzer; avionics test stations MC--90 line replaceable units OIF ready

- Certified priority AC/DC capacitance tester; one-deep 723 AMS asset--C-5/C-17 fuels mx completed on-time
- Certified priority guidance control test system; beat deadline by 4 hours--uninterrupted ops for four fighter sq's
- Certified priority night-vision tester; restored Balad acft mx capability--ensured safe night-time OIF recon ops
- Certified priority stray voltage detector; restored Balad's wpn pylon testing--36 F-16s MC/sustained OIF msns

- Certified Spangdahlem newest T20C test cell; completed 2 days ahead of schedule--averted eng work stoppage
- Certified three lab torque stds; restored lab's torque calibration capability--enabled 275 TMDE mx actions
- Certified two 52 FW priority amplifier plug-in units; restored EW station FMC--70 A-10 attack pods verified
- Checked lab std leveling head; enabled surface plate cal--supt'd 24 boresight fixtures across USAFE/AFCENT

- Chosen as TMDE section chief; normal MSgt position...selected over two MSgts--flt met 100% of sq suspenses
- Chosen as wingman day facilitator; enhanced group discussions concerning responsibilities/suicide prevention
- Completed 1-day Access course; incr'd flt database troubleshooting capability--maintained 10 flt mgmt systems
- Completed 100% 5-lvl core tasks; finished OJT 5 mos ahead of schedule--scored 90% on end-of-course exam

- Completed 10V DC ref intercomparison; normally reserved for 7-lvl tech--assured Ramstein NIST traceability
- Completed 254 mx actions...19 CRF/6 lab stds; drove flt's equip availability rate to 97%--bested AF 93% std
- Completed 260 end-of-line/over-the-shoulder insps; removed 32 process errors--flight effectiveness up 20%
- Completed 63 mx actions...seven CRF/four lab stds; drove flt to 96% equip availability rate--beat 93% AF std

- Completed 7-lvl upgrade core tasks--finished 2 mos early; attended advanced trng school--earned 91% average
- Completed advanced Access computer course; utilized enhanced skills--maintained 10 critical flight databases
- Completed AF trainer course; trained five Amn on linear task--element capability up 40%/flt coverage up 25%
- Completed AFSO21 Lvl 1 trng course; led rapid improvement team practices--prep'd future efficiency changes

- Completed AFSO21 trng course; led two Al Udeid events--cut shipping backlog 80% & overdue equip by 75%
- Completed boresite fixture trng; task normally reserved for 7-level--element critical task coverage incr'd 33%
- Completed cost risk analysis course; took section lead on AFSO 21 efforts--identified five improvement areas
- Completed countermeasures tester cal trng; task resevered for 7-level--critical task coverage increased by 10%

- Completed ESOH trng; completed 100% MSDS/chemical authorization inventory--eliminated four oversights
- Completed facilitator trng; guided 2 trend and 7 root-cause analysis sessions--QA nonconformities cut by 25%
- Completed high frequency synthesizer calibration training; normal 7-level task--section task coverage up 20%
- Completed in-resident Lean course/Univ Tenn; designed PMEL input-lvling sys--cut flt backlog 50% in 3 wks

- Completed measuring receiver trng; gained 7-lvl core task expertise--flt's critical area coverage incr'd by 10%
- Completed nine lab stds; enabled 128 high freq calibrations--flt met 96% equip availability rate...beat 93% std
- Completed priority signal generator for 1 CBCS; same-day return--enabled on-time msn deployment departure
- Completed scheduling of 1.2 K equip-items; validated 20 msn-critical priorities--enabled uninterrupted msn spt

- Completed spt agreements trng crse; overhauled flt prgm--wg SAV/UCI teams insp'd/found zero discrepancies
- Completed two AFSO21 trng courses; selected for USAFE event--cut MAJCOM assignment process time 25%
- Conducted 28 technical evals; scrutinized Al Udeid's lab processes--ensured calibration integrity in 300 prgms
- Conducted two trend analysis mtgs; id'd critical failures/causes--focused team on long-term corrective actions

- Consolidated production spt; reclaimed 123 sqft of space for required civ breakroom--facilitated bldg turn-in
- Constructed hydraulic drive fixture; cut calibration time 75%--restored 332 AEW/52 FW's acft wing flap mx
- Controlled equip awaiting parts inventory; aggressive follow-up reduced storage to .06%--lowest avg in 9 mos
- Conveyed Lean progress to 86 AW/CC & 3AF CCC; merged three CTKs/created spt section--lauded by ldrshp

- Coord'd 150 on-site cals in 3 countries; all assets certified on time--ensured medical/postal/embassy/U-2 spt
- Coord'd 211 lateral spt cals across 2 MAJCOMs; spt'd 75 AOR workcenters--backlog 1.25 days below AF std
- Coord'd 34 priority calibrations w/three USAFE labs; enabled uninterrupted warfighter mx--make a TSgt now!
- Coord'd 52 FW emer boresight fixture alignment; upgraded asset to serviceable--grounded F-16 returned FMC

- Coord'd 8 on-site high-voltage test stand cals; ensured 52 FW line replaceable mx--180 verifications complete
- Coord'd 856 lateral spt cals w/7 ext labs; spt'd 314 AOR/mil workcenters--cal backlog 5 days below 7-day std
- Coord'd acquisition of 20 dual-monitor setups; recovered $15K in assets--incr'd flt logistical productivity 25%
- Coord'd AF Metrology audit prep; conducted 400 lab std reviews--lab recertified on the spot....TSgt on point!

- Coord'd emer optical clinometer cal; restored 52 FW wps sys mx--grounded F-16 MC--make him a MSgt now!
- Coord'd force equip depot exchange; guaranteed force measurement capacity--spt'd 35 crucial OEF/OIF assets
- Coord'd priority current amp; restored acft chaff/flare cal capability--removed Al Udeid PMEL work stoppage
- Coordinated 13 priority fly-in cals--actions guaranteed 437th SOG AC130 gunship mission and deployment

- Coordinated 135 equip priority requests; critical assets delivered cal'd/MC--sustained OEF/OIF msns in AOR
- Coordinated 62 contract calibrations; direct-shipped critical assets to mx spt facilities--zero lost equip-items
- Coordinated acquisition of nine monitors; recovered assets/saved $6,000--incr'd logistic productivity by 25%
- Coordinated new cal facility acquisition; finalized msn requirements--secured future mx on 1.2K equip-items

- Coordinated six engine test cell calibrations; on-site mx completed on-time for USAFE F-16/A-10/C-130 acft
- Created multi-platform tracking database; incr'd compliance/decr'd prgm mgmt time 50%...promotion earned!
- Created PMEL suspense spreadsheet; provided supervisors tracking tool--drove 100% on-time EPR delivery
- Created TO tracking prgm; guaranteed on-time completion of 332 insps qtrly--enabled safe mx on 47 AGE sys

- Cut element backlog from 44 to 5 items; MXG Mx Spt Prof Qtr Jul-Sep '08--recent MSgt selection overdue!





- Deconflicted equip mx across 351 workcenters; 7,791 mx actions including 181 emerg calibrations/545 CRF
- Delegated three on-site reviews; empowered/trained team ldrs--reduced need for QA oversight during TDYs
- Deployed 6 techs to five FOLs; tested/cal'd non-transportable equip--facilitated continuous combat capability
- Deployed to Al Udeid AB; created vital efficiencies--accomplished PMEL msn despite 3K-sq-ft lab shortfall

- Deployed to Al Udeid PMEL; certified 481 TMDE items; outproduced 15 Amn/NCOs by 40%--promote now!
- Deployed to Al Udeid; tracked 6.5K items/shipped $34M in assets to 31 bases in AFCENT AOR--promote!
- Deployed to Greece; trained Hellenic AF techs on 20 measurement stds--NATO ally capability increased 50%
- Designed/integrated 1.3K-file TO server/LAN; ensured 100% currency/26 work-stations available--promote

- Developed element's 1,200-item compliance checklist; id'd/fixed 100 discreps--prep'd flt for '09 LCAP insp
- Developed QA verification checklist; id'd/fixed 28 flt discrepancies--ensured MXG "Excellent" LCAP rating
- Developed TMDE documentation trng; briefed 200 sq mbrs--contributed to MXG '09 LCAP "Excellent" rating
- Digitally converted 419 historical files; expedited file recovery/accountability--zero errors noted during SAV

- Directed 14K+ mx actions; supported 24 countries/435 customers--reduced flight turnaround time 50% in 1 yr
- Directed 16 hour emergency test fixture repair/calibration--returned 52 FW F-16 aircraft maintenance FMC
- Directed 3.4K mx/418 CRF items/79 priority actions; incr'd lab equip availability rate 97%--4% above AF std
- Directed 855 mx/54 AOR equip-items/37 priority actions; 155 work centers spt'd--zero OEF/OIF msn delays

- Directed 9.5K mx actions/344 CRF items; serviced 125 priority requests--accounted for 64% of PMEL output
- Directed C-130J life spt rack fabrication; ensured equip availability for acft transition--averted acft grounding!
- Directed digital multimeter trng; qualified 11 NCOs on core task--crucial CFETP rqmt met...promote to TSgt!
- Directed emer 52 FW boresight fixture mx; line of sight capability MC--enabled wpn sys alignment of 23 F-16s

- Directed emer airfield barrier sys mx; certified eight gages/restored sys FMC--protected acft against brake fail
- Directed emer test set fabrication; enabled climb/dive valve test, restored grounded B-1--ATO msn complete
- Directed four engine test cell calibrations; on-site mx completed on time--spt'd USAFE F-16/A-10/C-130 acft
- Directed Pirmasens radar station counter calibration; req'd for NATO EW mx--zero trng delays for 19 nations

- Directed priority chaff test set insp; ensured F-16 missile ops check readiness--no LIMFACs to Balad AB, Iraq
- Directed Romania's 1st C-130 test cell cal; successful mx/install--NATO country rdy to spt 4 acft/18 engines
- Dispatched six cal teams; directed 294 offsite calibrations in five countries--non-stop med/postal/embassy spt
- Distributed/org'd manpower; cut process redundancies...reduced flt backlog, 8 to 3 days--best seen in 12 mos

- Drove 187 priority PMEL requests; produced 6K+ joint/coalition units--sustained 96% equip availability rate
- Drove 30 root cause analyses; QA rate up from 88 to 97%--USAFE Lance P. Sijan award winner; SMSgt now!
- Drove element QA pass rate up to 100%; highest in 2 years--pushed flight to 97% pass rate...highest in USAFE
- Drove excellence in element; 75 flawless insps--helped flt achieve perfect QA rate Feb & Jun '10/best in 2 yrs

- Drove excellence in mx; 409 QA insps conducted/93% flt pass rate--13 mbrs awarded MXG QA "Honor Roll"
- Drove intricate C-17 door repair in <6 hrs/12-hr std; restored structural integrity--guaranteed on-time OIF msn
- Drove section QA pass rate from 88% to 100%; highest in 2 yrs--pushed flt to 97% pass rate...best in USAFE





- Ensured six AFTO 22 submissions; initiated new AGE diagnostic procedures--slashed 4 hrs equip touch-time
- Excellent leader! Supervised 20 Amn; decr'd backlog 120 to 30 items--drove flt equip availability rate to 95%
- Executed AFSO21 Lean 50-item/day lvl'ing sys; created backlog predictability--cut backlog 60%...promote
- Executed emergency magnetic simulator calibration; alleviated C-130E magnetic bearing check work stoppage

- Executed failsafe meter cal for AF Metrology/Cal auditor; zero discrepancies noted--lab recertified on the spot
- Executed flawless AF-lvl proficiency test; coord'd results w/engineers--ensured standardized meas >400 items
- Executed two prgm self inspections; verified 20 electrical work benches/fixed vehicle discrep--flt compliant
- Expedited emer O2 gage to Al Udeid AB; lifted cal capability in AOR--averted shipping F-15 TMDE to CRF

- Expedited emer priority jack gauge calibration; enabled F-15 directional thrust checks--44 acft rendered MC
- Expedited flt's pressure std cal; allowed mx on 150 equip-items--spt'd Project OLIVE HARVEST...TSgt a must
- Expert Electronic Standards Section trainer--trained six technicians on section's most complex test equipment
- Expertly managed 56 CMS GTC prgm for 252 account mbrs--60-day lates down to zero for 125 sq transactions

- Expertly managed 80 line-items of benchstock; $3K value--assured 100% stock availability to perform mx ops
- Expertly trained new deployment manager--ensured smooth transition; zero errors/downtime for 600+ people





- Facilitated AIM-9 missile guidance tester repair; asset serviceable--seven missile guidance systems ops tested
- Facilitated oscilloscope calibrator repair; restored lab's capability by 20%--55 TMDE mx actions completed
- Facility mgr of 17K-sq-ft PMEL; environment control > 95% (90% std)--certified by Director, AF Metrology
- Familiarized Pakistani AF officers w/PMEL mgmt; vital to success of aspiring lab--improved foreign relations

- Filled 4-mo PMEL section chief vacancy; normal MSgt position; incr'd flt equip availability from 93% to 97%
- Filled CMSgt flt chief position for 5 mos; spt'd 7K mx actions/8 wgs--equip availability rate 3% above AF std
- Filled Waveform Analysis TSgt supervisor position for 3 mos; chosen among 12 NCOs--line # well deserved!
- Finished 86 CS emer freq std; restored satellite tracking station FMC--ensured uninterrupted regional C2 ops

- Finished 9 hrs online classes/2 wks OJT; met MXG's computer administrator rqmts--awarded CSA certificate
- Finished Access computer course; applied knowledge and enhanced tools--revamped 10 calibration databases
- Finished Access/Excel seminar; coord'd 10 classes for peers/built equip database--cut mx documentation 20%
- Finished advanced Microsoft Excel course; developed user-friendly database--tracked 400 on-site calibrations

- Finished AFIT's Continuous Process Improvement/QA crses; applied lessons--reorg section/cut workflow 10%
- Finished all 5-level core tasks; scored 91% on end of course exam--completed trainer course/trained 15 techs
- Finished pri 52 FW weighing sys levels; restored wt/balance mx cap--40 F-16s deployed to Balad AB on-time
- Fixed 52 FW scale; restored flt control pre-install weight verifications "on-site"--four A-10 acft FMC in 2 hrs

- Flawless over-the-shoulder audit eval; zero quality/process errors noted--key to Al Udeid's lab certification
- Flawlessly calibrated digital oscilloscope for '08 AF Metrology/Calibration audit; lab recertified on the spot!
- Flexible! Certified TMDE in three elements; helped cut backlog to 3.7 days--3.3 days better than AF standard
- Flight security manager; prep'd prgm for UCI...zero defects during '09 Ramstein UCI--sq/grp rated "Excellent"

- Flight's top producer! Certified 1,140 TMDE items; drove flt equip availability rate to 96%--beat AF 93% std
- Flt QA augmentee; filled 1-mo QA shortage; performed 15 quality/2 process reviews--cut QA backlog in half
- Flt TDY manager; coord'd six on-site visits to five countries/certified 200 TMDE--non-stop embassy/post spt
- Flt's computer "go-to" Amn; aided element in AFMETCAL Audit "Excellent"--grp Mx Spt Pro 2Q10...promote

- Flt's process improvement team mbr; streamlined two critical areas--synchronized cal processes for 72 techs
- Forged Afghan Central Mx Depot continuity prgm; streamlined/standardized five prgms--reduced rework 85%
- Forward deployed to Ali AB, Iraq; coord'd airlift...asset certified--updated item after two AEF cycles overdue





- Great technician! Certified 114 complex items; drove flt backlog from 8- to 4-days--smashed flight 7-day goal
- Guided infrared target sim exchange prgm; sole overseas depot--6 FWs spt'd...enabled CAF AIM-9 accuracy
- Guided Lean event; cut shipping backlog to 2 vs 10 days/overdue equip to 1% vs 5%--ready for SMSgt now
- Guided USAFE's busiest transient alert; 10-mbr/24-hr contract op--spt'd 5,584 acft/517 mishap-free DV msns





- Hand'picked for bi-annual Turkey TDY; serviced 50 platform scales--critical for GSU intra-theatre shipments
- Hand-picked for POTUS spt MRT; repaired FOD damaged C-17 engine intake--prevented critical msn delay
- Handpicked >50 techs; completed advanced Phys/D trng...7-lvl task cert--incr'd CENTCOM/AFRICOM spt
- Handpicked for flt prgms section; learned/absorbed seven additional duties--freed 14 Amn for msn objectives

- Handpicked over five for CUT; shipping section's OEF/OIF spt doubled--facilitated >2K lbs TMDE shipped
- Headed 15 root-cause analysis sessions; drove 18 corrective actions--flt's QA pass rate 93%...highest in 8 mos
- Headed flt's 6S initiatives; slashed equip inventory/leveled input--returned $100K to supply/cut backlog in half
- Helped administer flt's vehicle program; zero discrepancies for '09 UCI--sq/grp/wg earned "Excellent" rating

- Helped manage flt CTK program; zero discrepancies during '09 Ramstein UCI--sq & grp awarded "Excellent"
- Highly motivated; completed 60, 5-lvl core tasks in 50% allotted time--incr'd low freq section manning 10%
- Honed signal generator output; spt'd 37 spectrum analyzer calibrations--enhanced C4I sys ops--promote now!
- Hosted delegation from Pakistan AF; trained on six critical areas--poised sale of 20 F-16 acft to key US ally

- Hosted Pakistan AF delegation; mentored OCO ally on production control ops--aided buildup of cal capability
- Hosted Pakistani AF delegation; trained techs on metrology principles--aided NATO ally build calibration cap
- Hosted two Pakistani AF PMEL techs; oversaw training on 20 tasks--expedited FMS acft to key regional ally
- ID'd fault in O'scope mx...submitted change; TO changes apprv'd/set-up shortfall deleted--47 PMELs affected





- Id'd o'scope mx fault...submitted TO changes; approved at HHQ/omitted shortfall--225 units affected AF-wide
- Id'd/removed form letter discrepancies; expedited improvement implementation--equip overdues reduced 18%
- Identified faulty thermocouple test set calibration; submitted change--saved 75 hrs/yr...155 equip-items affected
- Identified lost shipments; led supply receiving yard search in AOR--$65K worth of test equipment recovered

- Identified task qualification deficiency; established F-16 calibration adapter trng plan--doubled task coverage
- Identified three analytical balance TO deficiencies; AFTO 22 submitted/approved--78 labs affected...promote!
- Identified trng shortfall/trained techs; tripled mx capability/cal'd 18 NVG testers--enabled OEF/OIF night ops
- Identified/corrected CTK prgm shortfall; prep'd flt/Amn--zero discreps for '09 UCI...MXS rated "Excellent"

- Implemented 50-item/day input leveling; cut backlog 10 to 5 days--beat 7-day goal...already performs as SSgt!
- Implemented flt Lean event; created HAZMAT visual mgmt tool--laid foundation for sq-wide implementation
- Implemented flt Lean event; teamed with software mfg/integrated touch screens--cut flt TO navigation 3 hrs/day
- Implemented radar test set automated procedure; four units certified--cut calibration 80%/shortened mx 2 days

- Implemented sq APECS tracking process; provided 41 mbrs cold weather gear--saved >$7K personal expense
- Implemented standardized environmental tracking system; logged/updated 18K hrs data--saved >24 hrs/month
- Improved area layout; eliminated safety hazard/enhanced TMDE process flow--saved 2.5 miles walked wkly
- Increased flt computer mx/network capability; 1 of 3 qualified CSAs in MXS--decr'd network down-time 50%

- Initiated C-130 alt fuel quantity mx approval; mitigated tedious restoration--eliminated 86-hour harness change
- Initiated customer service lean event; id'd three waste areas/applied immediately--leaned redundant processes
- Injected quality focus into AF's only PMEL CRF--critical eye ensured AFCENT/warfighter equip 100% ready
- Insp'd/corrected HAZMAT prgm shortfalls...prep'd flt/Amn--0 writeups for '09 UCI...sq/grp rated "Excellent"

- Insp'd/prep'd HAZMAT/chem prgms; facilitated overall sq/grp/base UCI '09 "Excellent" ratings--SMSgt now!
- Inspected 297 TMDE items; included four priorities/42 OCO critical assets--earned 86 MXG 2d qtr honor roll
- Inspected 32 flt prgms; id'd & corrected 17 lab-wide deficiencies--returned Al Udeid lab to MSEP guidelines
- Inspected 86 MXG CTK prgms; id'd 26 improvement areas during LCAP prep--validated 100% flt compliance

- Inspected/maintained HAZMAT prgm; zero errors noted during '09 ESOH Camp insp--flight rated "Excellent"
- Instilled quality mindset; drove 93% element QA pass rate on 28 insps--raised flight pass rate up 4% to 89%
- Instituted customer-to-lab direct shipping; cut third party rqmt/slashed 14 days travel--560 shipments affected
- Instituted digital work center files; converted 319 folders/enhanced file accountability--eliminated paper waste

- Instructed eight Mx Resource Mgmt classes--instilled safety mindset to 63 Amn...MSgt line number deserved
- Inventoried 980 deployable stds; $425K in inventory accounted--zero losses/readily postured for AOR tasking
- Invigorated Misawa's TMDE Flt safety prgm; id'd/fixed nine discreps--zero findings on two MXG QA insps





- Key role in 86 AW acft transition; fabricated six C-130J life support racks--avoided $180K procurement costs





- Learned equip input wiring; researched TO, built trng outline/trained eight Amn--section avg'd 89% pass rate
- Led 1 CBCS radio test set alignment; restored grnd radio testing capability...deployment departed as scheduled
- Led 17 technicians; directed 9.5K mx/344+ CRF/125+ priority actions--accounted for 64% of laboratory total
- Led 19 mbrs/AOR's only Precision Measurement Equip Lab (PMEL); 15K items valued $19M--spt'd 31 FOLs

- Led 1K+ mx actions; 319 customers/5 bases/8 wgs spt'd--incr'd equip availability rate to 97%/beat std by 4%
- Led 1st-ever PMEL TDY to Pakistan; set up 5 stds/trained 13 ldrs on 15 tasks--improved ally's cal capabilities
- Led 52 FW TMDE coordinator review; insp'd 7 OWCs in 4 sqs--corrected 19 errors/provided on-the-spot trng
- Led AF Metrology insp prep; 6/6 crit areas 100%, sched/supply spt "Excellent"--rec'd 2-year base lab recert

- Led Belgium on-site team; tested fuel lab analytical balance--maintained fuel contaminate detection capability
- Led Belgium/Netherlands TDY; certified 23 items/Chievres fuels balance verified--impurity detection restored
- Led C-130 alt fuel quantity mx; 15-hr probe change averted 86-hr in-tank mx--OCO acft returned to warfighter!
- Led C-130 bulkhead repair; buttressed load-bearing component/enhanced rigidity--slashed 36-hr std by 10 hrs

- Led Cyprus deployment team; calibrated 51 TMDE items--sustained Project OLIVE HARVEST U-2 recon ops
- Led element through AF Metrology audit; four items complete w/zero errors; one tech coined--lab re-certified!
- Led emergency boresite fixture alignment; allowed 20mm gun installation--grounded A-10 returned to service
- Led flt Entry Control Point; evacuated bldg during UXO inject--key to Osan's "Excellent" rating during '09 ORI

- Led lab through AF Metrology/Calibration audit; 11/11 items passed; two performers coined--lab re-certified!
- Led meter calibrator training; certified 3 SSgts on 7-lvl task--ensured 100% task coverage/all upgraded on time
- Led on-site calibration team; certified 52 FW test cell 2 days ahead of schedule--averted eng work stoppage
- Led on-site team to Turkey; managed 50 calibrations/five remote locations--mission completed 3 days early

- Led one-of-a-kind C-130J test set repair; troubleshot to component level--OCO/AEF msn support unhindered
- Led prep plan for HHQ's audit; 30 trng events/600 lab stds reviewed--AF Metrology insp'd...best seen in 6 yrs
- Led prgm element team's self-insp; fixed 12 errors on safety, security, vehicles prgms--postured flt for LCAP
- Led RAF Akrotiri, Cyprus cal team; certified 32 equip-items for unique msn--spt'd Project OLIVE HARVEST

- Led Romania's 1st C-130 test cell cal; successful mx/install--ensured NATO country MC to spt 4 acft/18 engs
- Led TDY to RAF Akrotiri; team certified 50 items--sustained Project OLIVE HARVEST reconnaissance msn
- Led TDY to Turkey; certified 70 scales at five sites--enabled postal spt and compliance w/federal regulations
- Led the production effort of Air Force One chocks; Ramstein AB first--lauded/signed and retained by POTUS

- Led two elements; mentored 19 Amn/NCOs; pushed production/customer service--cut backlog from 6 to 3 days
- Led two man on-site team; certified two msn-critical 52 CMS high voltage stands--daily sorties met...SSgt now
- Led two man onsite team; certified physicians scale...200 mbrs weighed--helped ensure successful sq PT test
- Led two TDYs to 52 FW; repaired F-16 test cell--ensured mission critical asset available with zero downtime

- Led two-man on-site team; certified 52 CMS high-voltage test stand--supported 90 F-16 countermeasure pods
- Leveled Spangdahlem AB TMDE input; reduced 3-hr equip processing time by 30 mins--promote with peers
- Logged 125 mx actions and certified 70 equip-items; flt's backlog reduced from 6 to 3 days--best avg in 12 mos
- Logged 190 mx actions/163 items certified; lab's most productive Amn--equip avail rate 97%...bested std 4%

- Lvl'd 52 FW TMDE input; streamlined sched--largest customer of three MAJCOMs process time reduced 17%





- Maintained 100% QA pass rate through eight insps; element's quality 100%, Jan & Sep 09--beat flt goal by 5%
- Maintained 100% QA pass rate through eight insps; element's quality 100%, Jan & Sep 09--beat flt goal by 5%
- Maintained 100% quality pass on five inspections; directly aided flight 95% quality pass rate--best in USAFE
- Maintained 100% quality rate; passed 50 insps at Ramstein/Al Udeid PMELs--awarded MXG honor roll 3Xs

- Maintained 397 TMDE items; eight msn-essential priorities included--facilitated 50% reduction in flt backlog
- Maintained 735 network accounts; id'd/corrected 75 discrepancies--improved grp's IA compliance...insp ready
- Maintained Al Udeid equip account; managed 340 items/$6M assets--facilitated 12K AFCENT calibrations/yr
- Maintained flt vehicle prgm; attained zero quality defects for '09 UCI--sq/grp/base rated "Excellent"...promote

- Maintained six CTKs; corrected MIL documentation errors--led to sq & grp "Excellent" rating for 2009 UCI
- Maintained wing's 2nd biggest TO acct--4.5K books; defect free during '09 UCI--sq/grp/base rated "Excellent"
- Managed $1.5M government purchase card program--received "Outstanding" during annual contracting audit
- Managed $6.4M equipment account; validated new authorizations--improved CRF AOR calibration capability

- Managed 17 local PT LOX refurbs; avoided 2 mos transit/$85K cost--guaranteed AFCENT/joint medevac msn
- Managed 30 physical fitness sessions; instilled rigor--own involvement produced 100% pass rate on 55 Amn
- Managed 56 personnel evaluations; scrutinized technician/lab processes--ensured PMEL technical competency
- Managed 6K mx actions/calibrations w/597 AOR priorities--equip availability rate 96%; beat AF std by 3%

- Managed cal accessory prgrm; zero discrepancies '07 USAFE Mx Stan/Eval Prgrm insp--best in USAFE 2+ yrs
- Managed career field's busiest production control; 6.3K TMDE items scheduled/4 mos--$30M assets tracked
- Managed element upgrade trng; trained 10 three-levels on 29 core tasks--beat 5-lvl training deadlines by 40%
- Managed emer radar test set repair; allowed critical C-130J TCTO completion--two grounded 86 AW acft MC

- Managed Enhanced Tech Info Mgmt Sys flt access; ensured instant procurement of 1.1K TOs--msn unimpeded
- Managed equip awaiting parts; aggressive follow-up actions reduced inventory by 0.06%--lowest 12 mos avg
- Managed flt UCI prep; insp'd 1,450 compliance items/corrected 47 substandard areas--MXS rated "Excellent"
- Managed flt upgrade trgn; instituted tracking sys/study sessions for 13 Amn--50 tasks certified/4 EOC passes

- Managed flt's upgrade trng prgm; ensured 11 Amn upgraded on 59 tasks w/out delay--three course exams >90%
- Managed four deployable CTKs; helped facilitate on-site calibration spt--four test cells & 150 items certified
- Managed GPC prgm records; accountability lauded during wg annual surveillance--earned "Outstanding" rating
- Managed infrared target simulator exchange prgm; USAFE's sole depot--ensured CAF AIM-9 missile accuracy

- Managed OWCs delinquent equip delivery; overdues down 2.5% to 0.9%--beat equip avail rate AF std by 3%
- Managed sq AEF tool; ensured 330 pers & 600 asset accountability; maintained accurate deployment posturing
- Managed two TCTOs; directed time sensitive mx on 80 deployable units--msn ready 11 mos ahead schedule
- Managed USAFE infrared target simulator program; normally reserved for craftsman--vital to 172 CAF assets

- Managed USAFE/AOR target sim exchange prgm; upheld 1 of 2 AF depots--enabled AIM-9 accuracy in 6 wgs
- Managed work center overdue list; sched'd 193 delinquent items--incr'd equip availability rate from 95 to 97%
- Mended 305 shipping database errors; revamped/cleared records--follow-up efficiency up 39%...MSgt a must!
- Meticulous! Corrected six safety records; ensured 100% supervisor safety trng--prepared flt for upcoming UCI

- Modernized flt spt equip; replaced antiquated equip w/$546K in modern stds--improved cal capabilities 10%
- Modified TMDE coordinator trng; trained 72 monitors--incr'd effectiveness...reduced OWC input errors 12%
- Motivated Amn; completed 100% 5-level upgrade tasks in 67% of allotted time--scored 85% on course exam
- Moved technical order library; centralized 256 manuals into lab--reallocated space for prgms section stand up





- Optics expert; trained two...flight capability up 66%; earned sq Lt Gen Leo Marquez award '08--promote now!
- Orchestrated 13 acft brake assy repairs/overhauled 14 line replaceable units--returned $195K assets to supply
- Orchestrated manufacture of 15 dual bay hangar/Air Force Ball signs--enabled safe traffic-flow around facility
- Orchestrated mx supporting 23 bases/435 customers; raised equip availability rate to 97%--highest in USAFE

- Org'd Polish PMEL AF visit; trn'd ally team on C-130 equip calibration/purchase rqmts--2 Polish labs msn rdy
- Organized inter-Command stores release tester exchange prgm; zero spt delays for OEF/OIF msns--TSgt a must
- Organized section benchstock; zero discrepancies during '09 Ramstein UCI--sq/grp earned "Excellent" rating
- Organized upgrade trng for 25 flt Amn/NCOs; four new element core tasks completed--met new CFETP rqmts

- Outstanding producer! Certified 450 TMDE items; increased equip availability rate to 96%--beat AF 93% std
- Outstanding technician; certified 121 TMDE assets including one priority and 13 lateral support items for OIF
- Overhauled 51 MXS priority spectrum analyzer; incr'd F-16 EW pod testing 33%--saved $70K asset...promote
- Overhauled infrared std exchange prgm; instituted 12 process improvements--Flt FMC to spt USAFE/AFCENT

- Overhauled PMEL quality manual; reduced quality system errors 17%--key criterion for PMEL certification
- Overhauled RF wattmeter; cannibalized two unserviceable items...asset saved--prevented $4.8K depot repair
- Oversaw 1.5K shipments; $10M assets returned to 7 locations/three countries--supported all OCO warfighters
- Oversaw 12 TDYs for 24 mbrs; flawless trip prep--delivered on-time spt to 77 workcenters in five countries

- Oversaw 421 quality reviews; led improvement efforts across three flt elements--pass rate up 3.3% to 94.9%
- Oversaw 52 AMXS O2 gauge tester cal; 15 AMU life spt checks performed--OEF/OIF deployment tasker met
- Oversaw eight engine test stand calibrations; maintained CRF cap for AFCENT/USAFE--289 engines tested
- Oversaw emer boresight fixture cal; restored 52 FW's line-of-sight capability--enabled system mx on 20 F-16s

- Oversaw emer radar test set repair; allowed critical C-130J TCTO completion--two grounded 86 AW acft MC
- Oversaw emer theodolite repair; restored avionics optical test bench capability--returned Balad HUD spt FMC
- Oversaw flight upgrade training; 16 upgrade trainees met new CFETP reqmt--beat training deadlines by 40%
- Oversaw flt's target simulator prgm; USAFE's sole depot spt--dispatched 25 exchanges...99% on-time delivery

- Oversaw flt's UCI prep; insp'd 1K compliance items/corrected 47 substandard areas--sq/grp/base "Excellent"
- Oversaw infrared std exchange prgm; revamped continuity binder--6 FWs spt'd/ensured CAF AIM-9 accuracy
- Oversaw scheduling of 12.5K equip-items; validated 25 msn critical priorities--enabled uninterrupted msn spt
- Oversaw six TDYs for 12 mbrs; flawless trip prep--delivered on-time spt to 34 workcenters in four countries

- Oversaw spectrum analyzer repairs; cannibalized three assets...saved AF $10K--restored 52 FW EW station
- Oversaw three missile tester TCTOs; enabled two new missile insps--incr'd 20 F-16/A-10 cbt strike capacity





- Participated in AFSO 21 initiative; improved resistance std area layout--increased useable workspace 20%
- Performed 203 mx actions/135 cals/5 CRF/16 lab stds; incr'd equip availability rate to 97%--bested std by 4%
- Performed 69 quality/process insps; id'd eight discreps/led root-cause analysis--incr'd cal effectiveness 17%
- Performed emer navigation test set repair; returned in half std time--restored hostile area tactical airlift msn spt

- Performed emerg mx on 52 FW's comm/nav tester; enabled acft landing sys mx--on-time dplymnt of 22 F-16s
- Performed F-16 wpn test set TCTO; supported validation of sys upgrades--ensured inspection of 110 missiles
- Performed perfect digital voltmeter over-the-shoulder inspection; certification integrity assured--promote now!
- Performed satisfactorily as TODO; maintained 5,000 tech orders--50% pass rate during two QA inspections

- Performed six missile tester upgrades; enabled two new missile insps--incr'd 20 F-16/A-10 cbt strike capacity
- Performed temp probe eval for AF auditor; zero findings during '09 AF Metrology insp--Osan lab re-certified
- Performed TSgt scheduling NCOIC duties for 3 wks; processed 700 TMDE items--100% customer satisfaction
- Performs as seasoned SSgt! Provided complex digital multimeter trng to 11 SSgt/TSgts--met new CFETP rqmt

- Piloted C-130 leading edge repair; eliminated requirement for procurement--avoided $70K in acquisition cost
- Piloted Special Interpreter Visa pkg prgm; assisted applicants start-to-finish--enabled translator svc in region
- Pin-pointed 94 defects in 367 forms/MIS entries; trained 18 techs/rectified errors--earned 100% QA pass rate
- Premier manager! Drove QA pass rate to 97% avg; flight passed 147/150 inspections--100% peak for 2 mos

- Prep'd/trained 10-person shift; 4 flawless over-the-shoulder insps--facilitated MXG's "Excellent" LCAP rating
- Primed element for LCAP inspection; zero section discrepancies noted--86 MXG rated "Excellent"...promote
- Primed element/pers for Logistics Compliance Assessment Prgm insp; 86 MXG garnered "Excellent"--promote
- Prioritized 12K mx actions; accounted for 60% of flt output--equip availability rate 97%....crushed AF 93% std

- Prioritized mx across six wings; organized personnel/cut backlog from 7 to 4.5 days--beat AF goal by 2.5 days
- Problem solver; coord'd 55-gal drum moving equip buy; improved hydrazine ops--reduced tank fill times 28%
- Processed 100% of customers inventories/schedules; 256 products delivered--first time met requirement this year
- Processed 22 requests valued at $26K; ensured MC lab/enabled 1K+ equip calibrations--TSgt stripes a must!

- Processed 35 issue requests worth $36K; spt'd USAFE and OEF/OIF key msns--slashed repair cycle by 3 wks
- Processed 457 phase insps; ensured 100% scheduling effectiveness--MC rate 92%/crushed USAFE's 85% std
- Processed/scheduled 9.7K TMDE items; spt'd 479 work centers--decr'd overdue rate 0.9 to 0.4%...beat 1% std
- Procured $845 gage block replacement; timely GPC purchase restored flt's linear std--66 mx actions completed

- Procured critical optics std from item mgr; $6.6K asset diverted from DRMO--restored flt's optics capability
- Produced 52 CMS Avionics' oscilloscope; restored vital station asset--ensured stations held 100% FMC rate
- Propelled element QA monthly pass rate to 100%...highest in 3 years; drove flt to 97%--highest rate in USAFE
- Proven ldr; completed 6S trng/created mx process visual mgmt work table--eliminated potential for lost tools

- Provided downrange support; adjusted voltmeter for same-day turn to Al-Udeid PMEL--promote immediately
- Provided in depth training on F-16/A-10 stray voltage detectors; increased element coverage from 66% to 76%





- QA eval'd 4Xs...achieved zero process errors/100% pass rate; drove flt's rate to 96%--beat AF goal by 10%
- QA eval'd three times/achieved 100% pass rate; directly drove flt quality pass rate to 94%--best in USAFE
- Qualified on all 60 5-lvl core tasks in 67% of allotted time--12% ahead of peers; scored 93% on course exam
- Qualified on seven wpn sys cals; normally 7-lvl tasks...sole Amn of 23 trained--incr'd lab task coverage 5%
- Quality performance evaluated on eight insp's; achieved satisfactory 86% pass rate--score 6% below lab's avg





- Readied Al Udeid lab for AFMETCAL Audit; compiled QA data on 6K+ mx actions--lab certified...promote!
- Received boresites fixture cal trng; normally reserved for 7-lvl technicians--increased element capability 10%
- Received test cell calibration trng; incr'd element task coverage 10%--facilitated 76 CRF eng test/verifications
- Reduced unqualified/overdue trng by 90%; directly contributed to flt/sq/grp 2009 UCI "Excellent"--promote!

- Reduced wg overdue calibrations; personally coord'd equip transfers with mx units--decreased overdues 43%
- Refurbished critical radar signal simulator; ensured uninterrupted mx of 27 A-10s--averted $57K replacement
- Refurbished spectrum analyzer; Project Olive Harvest lone asset mission ready--averted $70K procurement
- Reinvigorated stagnant flt file plan; rebuilt from ground up--highlighted during UCI--promotion well deserved!

- Reorganized element test fixture storage; developed easy-to-use index--process streamlined for 77 calibrations
- Reorganized tac air navigation calibration (cal) area; implementd Lean principles--mx productivity up by 30%
- Repaired 52 FW emergency generator; electronic countermeasures station returned FMC--40 EW pods checked
- Repaired 52 FW stores management sys tester; restored F-16 missile pylon mx--prevented combat sortie delay

- Repaired AIM-9 missile guidance tester; turned asset FMC--allowed testing/ops of seven missile guidance sys
- Repaired Al Udeid generator; isolated fault to wiring/restored HF measurement capability--allowed 206 cals
- Repaired Al Udeid PMEL temp std; restored test stand calibration cap--ensured sole AFCENT test cell FMC
- Repaired Balad AB Avionics' cal adapter; restored two test stations--line replaceable unit certs uninterrupted

- Repaired capacitance tester; fixed faulty connector--enabled C-130 pre-flt fuel tank inspections...promote now!
- Repaired critical calibration fixture; enabled non-stop stores mgmt system calibrations supporting 16 F-16 acft
- Repaired faulty transponder test set cable; resumed 48 FW functional testing w/min delay--six F-16s deployed
- Repaired Fuel Quantity Test Set for Charleston AFB mx unit--supported uninterrupted repair C-141 external fuel tanks

- Repaired Kandahar AB's velocimeter; saved $650 asset--enabled continuous aircraft engine balance analysis
- Repaired lab signal generator; spt'd spectrum analyzer production--enabled non-stop testing for 44 EW pods
- Repaired lab test fixture; restored testing capability for 65 countermeasure units--enabled aircraft safety checks
- Repaired lab torque station; restored cal measurement capability--enabled mx/certification of 305 equip-items

- Repaired priority spectrum analyzer; ensured EC-130H combat sys integrity--averted customer work stoppage
- Repaired vital stray voltage detector testing fixture; minimal interruptions for 37 calibrations--28 acft spt'd
- Researched locally sourced parts; processed 36 govt purchase requests...$94K--TMDE MC/zero msn delays
- Resolved 2-mo resistance sys fault; teamed w/engineers...exposed wiring problem--eliminated 23 item backlog

- Resolved 8-mo drag brace fixture discrepancy; two assets restored FMC--averted grounding 52 FW F-16 fleet
- Resolved critical TO error...incorrect equip used; coord'd fix w/AF engineers--2 AF PMELs/5 assets affected
- Resolved delinquent OCO TMDE accounts; scheduled 465 overdue items--SWA equip availability up to 94%
- Resolved facility power failure; coord'd new generator lease/buy--saved $65K/averted PMEL work stoppage

- Resolved meter calibrator TO discrepancy; coord'd fix w/engineers--affected 74 AF PMELs/earned new stripe
- Resolved rubidium freq std TO discrepancy; corrected calibration method--averted $120K in replacement cost
- Resolved TO error/coord'd fix w/AF engineers; averted incorrect use of stds--two cal labs/five assets affected
- Resolved workcenter delinquent equip delivery; cut flt's overdue rate in half to 0.6%--bested AF std by 0.4%

- Restored lab's angular std; facilitated 606 ACS radar alignment--204 nautical miles of airspace kept in control
- Restored oscilloscope calibrator; primary std for 400+ TMDE items--seamless waveform analysis maintained
- Resurrected flt's roundness calibrator; slew lateral spt rqmt/3 wk return--averted F-16 phase inspection delays
- Reutilized assets from DRMO; enhanced use of resources/met flt needs for computer monitors--$6.5K saved

- Revamped Al Udeid's lab root cause analysis; program showcased--AFMETCAL Chief noted as "Outstanding"
- Revamped flt's periodic mx prgm; zero errors noted during UCI--contributed to sq/grp/base "Excellent" rating
- Revamped HAZMAT process; fabricated eight visual mgmt tools--averted contamination of 10 waste streams
- Revamped safety locker; personal protective equipment made readily accessible--ensured safety of 68 Amn

- Revamped shipping/receiving processes; realigned shift/work flow--reduced processing time from 3 to 1 day
- Revamped supply program continuity binder; benchmarked by 51 MXS--earned UCI/LSET "Excellent" ratings
- Revamped trng/master plans; updated lesson material/ensured 100% task coverage--57 Amn met upgrade rqmt
- Revamped/streamlined PMEL web page; added OWC Master/Schedule listings--95% faster and more efficient

- Reviewed 735 net accounts; id'd/fixed 75 errors--aided in grp's Info Assurance Assessment Prgm insp success





- Scheduled 294 off-site cals in five countries; 177 TMDE assets certified--nonstop medical/postal/embassy spt
- Scheduled 6.4K TMDE items; coordinated 15 msn essential priorities--increased EAR to 97%...USAFE's best
- Scheduled over 2,100 items with 100% accountability--critical single-point contact for 3,000 units in AOR
- Secured boresite fixture trng; enabled F-16 munitions sys alignment--element cap incr'd 33%...bombs on target

- Selected for off-station calibration team; certified eight items in two countries--enabled 6M lbs mail transit/yr
- Self-taught new resistance measurement console...sole flt tech certified; trained two 7-lvls--coverage up 200%
- Serious about success; completed 59 upgrade core tasks--finished 100% of OJT rqmt in 67% of allotted time
- Setup 20 laptops/network...$20K proj; incr'd digital TO availability to 60 techs--aided in >1K mx actions/mo

- Setup flt trng day; 10 Amn trained on 17 new 5/7-lvl upgrade tasks--assured lab met new CFETP requirements
- Sharp SNCO! Coord'd PMEL/Polish AF visit, trn'd ldrship on C-130/F-16 equip ops--2 Polish labs msn rdy
- Sharp SNCO; led missile tester TCTO, restored pylon mx capability at five FOLs/averted delays--SMSgt rdy!
- Shipped 89K lbs outbound cargo; cut items awaiting shipment to 0.2% of inventory--66% reduction in 3 mos

- Skillfully commanded measurement assurance prgm--validated calibrations to ensure AFMETCAL stds met
- Solid technician; calibrated 135 TMDE assets; increased lab equip availability rate to 96%--beat AF 93% std
- Solved 52 FW test cell wiring problem; fault eluded contractor for 6 mos--returned A-10 engine testing FMC
- Sought & received trng on primary pressure std; one of four techs qualified to use--incr element coverage 25%

- Sought out critical task tng; verified high-voltage test stand--90 F-16 countermeasure test pods rendered FMC
- Sought out vibration console trng; normally reserved for seasoned 5-lvls--incr'd element's task coverage 50%
- Sought/received trng on critical high pressure oil std; one of three techs qualified--incr element readiness 50%
- Sparked 6S adaptation; slashed equip inventory/leveled input--rtn'd $100K to LRS/reduced acct manhr burden

- Spearheaded 750 TO insps; id'd/corrected LEP process--ensured 100% compliance 72 hrs ahead of deadline
- Spearheaded element LEAN initiative; reorganized resistance standard area/cut waste--incr'd workspace 20%
- Spearheaded flt 6S event; reduced wasted inventory/id'd 50 lab assets for turn-in--returned $100K back to AF
- Spearheaded mx/repair effort; 7K cals...spt'd 5 bases in 4 MAJCOMs--equip avail rate 96%/bested AF std 3%

- Spearheaded rapid improvement event; simplified lateral spt process/coord'd 268 cals--reduced turn-time 70%
- Spt'd CDDAR classes; eight mbrs trained from 86 MXG/721 AMS/309 AS--bolstered regional readiness stds
- Spun-up/led flt's new prgms element; organized 11 critical prgms under 3 people--manning rqmts reduced 86%
- Sq Programs Flt Chief...filled 4-mo vacancy; managed 22 prgms and led 14 Amn/NCOs--spt'd 300+ MXS pers

- Sq supervision GLM; oversaw >200 compliance items/corrected 13 errors--clinched grp's LCAP "Excellent"
- Sq TMDE "blitz" team lead; reviewed compliance items/corrected 30 errors--aided in grp's LCAP "Excellent"
- Standardized 86 AMXS sole engine instrument tester; restored C-130 engine sensor mx--saved AEF mission
- Standardized emer signal digitizer; avionics test station FMC--averted work stoppage...superior Amn/promote!

- Streamlined flt shipping process; enhanced TMDE cargo flow w/TMO--50% decrease in doc/packing errors
- Streamlined high-use mx bench accountability/housekeeping; reduced FO write-ups--ZD on last 3 MXG insps
- Streamlined TMDE coordinator class; trained 72 work center monitors--reduced scheduling input errors 12%
- Stressed TO compliance/root-causes; superb quality results--93% pass rate in 277 insp's/bested AF std by 3%

- Studied rqmts/instructed section on package/equip control sys--on-time delivery of 500 assets to spt AOR ops
- Studied trng requirements; id'd/corrected shortfalls--zero write-ups for '09 base UCI...sq/grp rated "Excellent"
- Superb diligence; zero bench/ops stock write-ups for '09 USAFE UCI--MXS earned "Excellent"...promote now
- Superb leader; revamped vehicles prgm...zero write ups during '09 UCI--sq/grp/wg earned "Excellent" ratings

- Superb technician; produced 140 TMDE assets; incr'd lab equip availability rate to 96%--beat AF std by 3%
- Superior performer! Certified over 60 items of TMDE, key to laboratory's 5 day backlog--lowest backlog in years
- Superior trainer! Trained 10 Amn on pwr sensor calibration; incr'd lab capability 40%--met new CFETP rqmt
- Supervised 10 techs; directed 2.8K mx actions/1.6K calibrations w/107 CRF items--zero OEF/OIF msn delays

- Supervised 130 TCNs while deployed; safeguarded $26M fighter ramp/taxiway proj--zero security incidents
- Supervised 25 Amn; developed/executed flt clean-up & work detail prgm--provided pristine lab common areas
- Supervised 370 AOR/175 local msn-emer cals; restored 110 workcenter msns--zero LIMFACs for TMDE spt
- Supervised 7 F-16/A-10 missile tester TCTO completions; power line checks c/w--ensured safe mx on 62 acft

- Supervised emer balance analyzer calibration; restored Kandahar Predator eng mx--prevented OEF msn failure
- Supervised fabrication of 15 acft drip pans for dual bay and AMC hangars--eliminated environmental hazards
- Supervised five Airmen across two AFSCs; busiest production control element--1,386 shipments worth $26M
- Supervised priority nozzle shim fixture mx; 1st time calibration at Ramstein--returned Bagram F-15 mx FMC

- Supervised Romania's 1st C-130 test cell cal; successful mx/install--NATO country MC to spt 4 acft & 18 engs
- Supervised six emer weapon tester cals; restored missile pylon mx--20 F-16s deployed...promotion warranted!
- Supported coalition warfighter; oversaw Iraqi AF test set alignment--restored oxygen regulator test capability
- Swiftly calibrated five digital protractors; normally reserved for 5-lvl--directly supported OEF/OIF--promote





- Teamed w/engineers; solved yr-long humidity generator fault; vital to 320 items--saved $35K depot TDY costs
- Technical expert! Certified on all 18 section critical tasks; 100% weapons test set qual'd--critical to 16 F-16s
- Tested 1 CBCS optical level sys; ensured critical satellite comm configuration--sustained msn essential C4I
- Tested 42 AES platform scales; pallet weighing/acft balance MC--direct spt to newest AFRICOM airlift msn

- Tested 52 FW emer temp/humidity tester; aided work/rest cycle monitoring--ensured on time OCO deployment
- Tested 86 AMXS anti-skid tester; returned C-130 braking system insp capability--facilitated pilot/acft safety
- Tested Bagram AB comm analyzer; ensured radio mx/air-to-grd comm--facilitated coalition combat air strikes
- Tested Balad optical clinometer; restored avionics optical test bench cap--allowed 25 F-16 HUD verifications

- Tested comm analyzer; ensured radio mx/air-to-ground comm--bolstered Ramstein's deployment/trng msn ops
- Tested complex 379 EAW spectrum analyzer; 7-lvl task--allowed mx on downrange Combined AOC TMDE
- Tested lab meter calibrator; returned voltage measurement capability FMC--allowed 223 cals...must promote!
- Tested pri 52 FW micrometer; allowed HPT alignment...reduced eng vibration--facilitated 40 eng installations

- Tested signal generator; restored pwr measure cap...1 of 2 USAFE/AFCENT assets--enabled 375 calibrations
- Tested two generators; returned Ramstein/Feltwell labs' phase noise measurement sys FMC--enabled 80 cals
- Tracked 1,500 mobility action-items; removed 120 disqualifiers--assured flt's >90% world-wide qualification
- Trained 10 Amn on 5-level upgrade task; flt met new CFETP requirements--increased lab's capability by 10%

- Trained six Amn on 10 core tasks...assured flt met new CFETP requirements--incr'd mission capability 28%
- Trained six physical/dimensional technicians on 16 tasks; incr'd section critical certification coverage by 60%
- Trained six techs on 138 workcenter tasks; capability up 40%--flight met new CFETP upgrade requirements
- Trained two Amn on o'scope calibration; increased section capability 15%--slashed section's backlog by 20%

- Trained two on C-130 test cell alignment; task coverage doubled--asset restored...eliminated CRF eng backlog
- Trained two technicians on chaff testers; doubled task coverage--removed flare tester backlog...TSgt a must!
- Trained/cert'd as customs clerk; cleared commercial transport shipments--enabled inter-country postal delivery
- Trained/cert'd on oscilloscope calibration; identified/corrected procedural error--47 PMELs affected AF-wide

- Trained/certified on 11 core tasks; key knowledge applied to mgmt/insp activities--7,800 equipment-items MC
- Troubleshot armament test set; isolated fault to defective circuit card--averted $50K depot repair...TSgt now!
- Troubleshot microwave measuring receiver; isolated input mixer circuit card fault--std returned MC to AOR
- Troubleshot propeller housing test stand; isolated faulty temp switch...asset saved--prevented $3K depot repair

- Troubleshot/aligned sole C-130 engine test stand; asset supports 289 engines/48 acft--combat missions ensured
- Troubleshot/restored signal generator; only two in AFCENT AOR--returned pwr capability/enabled 375 cal's
- Turned Spangdahlem's wt system 4 hrs ahead of schedule; eight F-16s wt/balance completed on time--promote
- Turned two fuel impurity scale reviews; restored purity checks in half the time--Kuwait/Iraq AORs 100% MC





- Upgrade trgn prgm manager; zero discrepancies noted during '09 base UCI--sq/grp earned "Excellent" ratings
- Utilized AFSO21 tools; improved section layout/enhanced TMDE scheduling flow--saved 2.5 mi/wk walking





- Val'd priority battery tester; restored Kandahar AB eng mx--grnd'd Predator returned MC/averted OEF msn fail
- Validated Al Udeid radar signal simulator; allowed EW system mx/insp--grounded B-1B MC/OIF msn saved
- Validated base primary current std; allowed certification of 108 TMDE items--aided non-stop C-130 support
- Validated communication test set draft procedure; ensured calibration accuracy--77 PMELs affected AF-wide

- Validated flt quality manual; id'd/fixed 15 discrepancies--prep'd flt for AF Metrology/cal audit...lab recertified
- Validated on-site pallet scale; ensured accurate cargo weighing 5K lbs--enabled mission essential acft balance
- Validated signal generator; enabled F-16/A-10 radio mx--sustained air-to-ground acft comm for OEF/OIF msns
- Validated/scrubbed 122 PMEL accounts; overcame personnel rotations--restored vital oversight

- Verified 15 52 FW armarment preload tester; vital element to F-16 weapon safety--uninterrupted OIF/OEF spt
- Verified 37 AS priority NVG test set; ensured C-130E pre-flt goggle testing--facilitated precise night air drops
- Verified 52 CMS priority spectrum analyzer; avionics test stations FMC--90 line-replaceable units msn ready
- Verified 52 FW stores mgmt tester...normal SSgt task; restored missile pylon mx--averted grounding F-16 fleet

- Verified 52 FW's avionics oscilloscope; 80 F-16 attack pods verified--averted possible sortie mission delays
- Verified 86 MXS life spt scale; facilitated Survival flt life raft CO2 bottle filling--allowed on-time AEF launch
- Verified 86 OSS scale; ensured precise CO2 bottle wt for countermeasure raft inflation sys--mx without delay
- Verified Al Udeid laboratory meter calibrator; cert'd half std time/averted mx stoppage--spt'd 215 AOR assets

- Verified Al Udied low freq signal generator; restored AFCENT phase noise capability--facilitated 100 cals
- Verified altitude/airspeed tester; restored flight control sys testing capability--on-time mx kept 16 C-130s MC
- Verified authorized asset accountability; completed $6.9M equip inventory--finished 25% ahead of schedule
- Verified emer 52 FW avionics test station pulse generator; 44 F-16 EW pods FMC--averted msn sortie delay

- Verified emergency priority Misawa fuel test set; allowed fuel sys pre-flt insp--zero sortie delays for 46 F-16s
- Verified five 52 FW voltage detectors; ensured uninterrupted pylon stray voltage mx--directly spt'd 15 F-16s
- Verified five mortar aiming sys; enabled accurate AOR warfighter artillery engagement--one-shot/one-kill!
- Verified lab oscilloscope; restored waveform measurement capability--facilitated 24 calibrations...promote

- Verified msn essential avionics test station pulse generator; 44 F-16 EW pods FMC--averted msn sortie delay
- Verified oxygen pressure test set; restored G-suit/mask pre-flt inspections/mx--ensured F-16/A-10 pilots' safety
- Verified priority line-of-sight boresite fixture; established precise munitions delivery reference--spt'd 24 F-16s
- Verified six fuels mgmt spt weight scales; completed in 1 day--ensured readiness of $1.8M war reserve assets

- Verified std wt scale; spt'd Turkey on-site visit; ensured intra-theater shipment--97 items calibrated/9 locations
- Verified three lab torque transducers; task normally reserved for 7-level--torque station FMC/enabled 1K cals
- Verified three vacuum cart gauges; restored exhaust nozzle testing on 24 F-16s--52 FW air superiority assured
- Verified two wattmeters for Al Udeid AB; rushed return to AOR--provided on-time contingency spt...promote

- Verified/aligned 81 AMU altitude test set; restored emer TCTO insp capability--returned grounded A-10 MC
- Verified/approved FOD prevention prgm; divided insp areas into zones--100% QA pass rate since inception
- Versatile; scheduled 12K equip items during manning shortage--key in flt's completion of 529 AOR priorities





- Weekend mx super; coordinated C-130 mx after in-flight emergency--left wing fuel leak fixed...OIF msn saved
- Worked 214 supply requisitions; cut awaiting parts inv to 0.04%--achieved best rate among cal labs in USAFE
- Worked priority ohmmeter alignment; AIM-9 missile sys verification MC--enabled 52 FW's OEF/OIF trng ops
- Worked two jobs simultaneously...element NCOIC/PMEL section chief; ready for more--promotion warranted!




Bullet statements may be contributed using this form.